
Increased property value
The number of rooms sets a home’s price, so you gain value from a well-built addition, and space too.
Home additions · Markham, York Region
Home additions in Markham of any size, from a dormer or a small bump-out to a rear addition or a second storey, built to match the house. One design-build team draws and builds it, with a dedicated project manager on the job throughout.


RoomThree-storey addition, Uxbridge
DetailUpper storey, mid-build
What’s included
For a Markham home addition we take on the design, the structure tying it to the house and any filing the lot needs beyond the City's building permit: an engineered grading plan, a tree permit or a TRCA permit.

On the ground floor, we add at the back or side so old and new rooms connect easily for movement, utilities and services.

Your house gains a second storey that’s as strong and durable as the floors it sits on.

We design and build a stand-alone structure on your lot with the team we’d use to extend the house.

New rooms match the old in style and materials, and one firm stays responsible until the occupancy permit.
How it runs
Six steps under one contract, with a dedicated project manager as your single point of contact.
At your home, we talk through your needs and measure everything. 1 wk, from week 0.
Buildable plans from your ideas, and materials picked to last. 4 to 6 wks, from week 1.
We base a clear quote on your budget and show every cost. 1 to 2 wks, from week 5.
Some jobs need a permit. We draw up those forms with the city. 8 to 12 wks, from week 6.
Trade scheduling and updates come from your project manager. 14 to 20 wks, from week 14.
When it’s done, touched up and clean, we go over every detail with you. 1 wk, from week 28.
Dedicated project manager, start to finish
The bars show typical timings, hatched where steps may run long. Schedules are set job by job.
Why add on
Build an addition well and it’s an investment in family life now and the house’s future value.

The number of rooms sets a home’s price, so you gain value from a well-built addition, and space too.

You can add a storey, an extra room or a few, or a freestanding building in your yard: up, out or new.

Layouts planned for easy movement, utilities and services, in the style and materials of the house you already have.

Because a single local design-build firm runs the addition, idea to occupancy permit, messages aren’t lost between companies.
Client reviews
Google reviews from the homeowners and business owners we have built for.
Google reviewsThey did a great job renovating my bathroom and creating one in my basement. Kevin was very easy to work with and was able to accommodate all our requests. Everything looks really good!
Nuance Construction did an amazing job on our custom bathroom addition on the 1st floor. The team was professional, punctual, and kept everything clean throughout the project. … They completed the work on time and within budget, which was a pleasant surprise. … The final result exceeded our expectations.
Kevin and his team helped me renovate my new home, which was done incredibly well. They're nice and easy to work with, and offered many suggestions to how my home could look like when I lack ideas. They pay good attention to details to …
I recently had the pleasure of working with Nuance Design Build for our new office renovation project, and I must say that my experience with them was nothing short of outstanding. From the initial consultation to the final walk-through, their professionalism, craftsmanship, and attention to detail were truly impressive.
Kevin and his team were instrumental to bringing my condo redesign vision to life! They were professional, knowledgeable in their trades and maintained great communication. They were a pleasure to work with and I would work with them again!
Kevin and his team completed a full renovation of our ensuite bathroom, shared bathroom, and laundry room and the results are amazing! Their craftsmanship and attention to detail really show in every part of the project. …
Just wrapped up our full home renovation with Kevin's team, what an amazing experience! Kevin and his crew made everything so easy from design to finish. The quality and craftsmanship completely exceeded our expectations. Couldn’t be happier with how our home turned out!
Thank you for turning my bathroom into one of those magazine bathrooms. Also excellent work on remove popcorn ceiling and adding pot lights.
I had an exceptional experience with the Nuance team. They were professional, transparent, and incredibly detail-oriented throughout the entire project. The workmanship was of the highest quality, communication was clear and consistent, and everything was completed on time as promised. I highly recommend Nuance Design Build for anyone looking for a reliable and trustworthy partner to bring their vision to reality.
Highly recommend Kevin and his team! They recently helped us finish our sunroom, and the whole process was smooth from start to finish. He’s very knowledgeable, easy to communicate with, and has a great attitude. We’re really happy with the result.
We just finished a full home renovation with Nuance! Kevin and his team made the whole process smooth—from design ideas to picking materials. The craftsmanship and quality blew us away. My wife and I couldn’t be happier with the results!
Kevin and his team are true professionals. We had a wonderful experience working with them on our home renovation. highly recommend Kevin and his team !
Kevin and his team are very professional, dedicated and easy to approach to. They can always provide the best advice based on my needs. I would definitely recommend them to my friends.
Kevin and team brought our visions to life. He understands our requests and relay the message to the team efficiently. Always ready to answer our questions/ concerns :)
I am really so much happy for the work you and your team has done there is no complaints you have great friendly people to work with keep up and wish you great success in your future Thanks 🙏
Reasonable price. All work finished on time. Efficient workers. Delivered what we expected.
01
Selected projects
Each of these seven recent GTA renovations comes with a job-site photo, taken before the work or partway through it.


UxbridgeWinter 2024
We took down the old garage, dug a new basement below it and built two levels on top. The addition is a full three storeys tall, and the garage now sits out front.



Richmond Hill
Dark as the room is, cream stools and open shelves keep it from feeling heavy. Around a matched island and backsplash of black marble, with white-and-gold veins over each face, charcoal cabinets rise floor to ceiling.



North York2026
The home kept its dark floors; warm white cabinetry and walnut tones suit them. The island is a double waterfall. A large pocket door opens to custom pantry cabinetry that frames a bay for the robot vacuum and open display shelves. It reaches the living area.



Downtown TorontoSpring 2024
Above the first floor, where the client’s parents live, we rebuilt two storeys. We took the laundry out of the kitchen, enlarged the third-floor terrace to take a new bathroom and reworked load-bearing structure to open up the plan.



Brampton2025
The owners gave the design free rein. Their basement became a lounge with a custom wet bar and a powder room, plus a nook built into the wall for the household’s cat.



UnionvilleSpring 2026
The wall around the water closet came out and the tub became a walk-in shower behind frameless glass. The double vanity, makeup desk and full-height storage are Egger shaker panels under Taj Mahal-style quartz.



Thornhill2026
The tub came out, and the bedroom entrance moved to the exterior wall behind a pocket door. A walnut slim-shaker vanity pairs one sink with a makeup area; the shower sets a marble floor against antique-brass fixtures.

Gallery
Kitchens, ensuites, basements and additions, with the framing and steel that come before the finishes.
Tap any photo to see it full size.Drag a row to scrub through it, or open any photo full size.
29photosKitchens, baths, basements & additions
Where we work
Kitchens, bathrooms, basements, additions and whole-home renovations in York Region, Toronto, Peel, Halton and Durham. The rings show roughly how long the drive is from our office, outside rush hour.
4 regions
York Region
Toronto
Peel & Halton
Durham
Not on the list?
Once we know where the house is, we can tell you. Our projects take us around the Greater Toronto Area.
Get A Free EstimateQuestions & answers
Short answers on home additions in Markham. The Markham tab covers permits, local rules and the houses themselves, and the other tabs cover cost, timing and insurance.
We price it once it's designed, and in Markham the ground can add an item of its own. A ground-floor addition that disturbs 50 square metres or more of existing ground needs a Residential Infill Grading and Servicing application, with an engineered grading plan, before the building permit can be applied for, so that engineering goes in the budget. Beyond it, size, complexity, materials and design work set most of the price.
Construction alone typically runs 14 to 20 weeks. Ahead of it come a week or so of measuring, 4 to 6 weeks of design development, a week or two on the estimate and 8 to 12 weeks for permit coordination. A tree can add time in Markham: injuring or removing a private tree 20 cm or more across needs a City permit, reviewed within 45 days of payment, so if one stands in the footprint or access route, we apply for its permit early.
Yes, the City's building permit, and on some lots one or two more. If TRCA regulates the lot, as it can on a ravine or valley lot, TRCA's permit for the building and any regrading or fill has to be issued before the City's, so that application goes in first. A house on a street in one of the heritage districts needs a heritage permit for the addition as well. We look up both before drawing anything.
Often, if the lot can take one, and the lot is what decides it. Setbacks and height come from the zoning by-law for your part of Markham, and a protected tree where the addition would stand needs a City permit first. We check both before you weigh an addition against a move, so the comparison starts from what the lot allows.
Yes. The City requires a building permit for any addition to an existing house, whatever its size, and for a new dormer, so even a small bump-out off the kitchen is drawn, reviewed and inspected. A small one can skip the grading step, though: the Residential Infill Grading and Servicing application applies once a ground-floor addition disturbs 50 square metres of ground or more.
Three kinds. Second-storey additions build up, rear and side additions build out on the ground floor, and a separate building can go in the yard. All three are designed to match the style and materials of the house.
Yes. Our designers and architects match your home’s style and materials so old and new blend, and the new space is built to last as long as the house it joins.
Yes. In Toronto the building permit comes from Toronto Building, and the drawings must show the addition meets the zoning. We prepare the drawings and applications, deal with the city on by-laws and zoning, and carry the job to the occupancy permit.
Size and complexity set the cost, and labour, quality materials and professional design fees are usually the biggest expenses. In Toronto, additions average around $200 per square foot and can rise past $350 for more intricate work.
In Toronto, a one-storey addition can start at about $300,000. Costs average around $200 per square foot and can pass $350 per square foot for more involved work. Labour, quality materials and professional design fees are the largest costs, and the addition’s size and complexity decide where it lands in that range. Nuance Design Build offers a free consultation and cost estimate, and builds the addition on a single contract, from the first idea to the occupancy permit.
Every Nuance Design Build project has a dedicated project manager who is your single point of contact. They coordinate the trades, run the schedule, oversee quality and keep you informed through demolition, rough-in, installation, finishing and the final walkthrough. You get a detailed construction schedule, updates before you have to ask, budget tracking and quality-control inspections, so you never have to chase different people for answers.
It depends on the scope and the municipality. Structural changes, additions and legal basement suites need a building permit, and the application itself can depend on where the home is. Nuance Design Build prepares the drawings and paperwork, works through the by-laws and zoning rules with the city and stays on it until the permit is approved. During construction we schedule and manage every required inspection.
A straightforward kitchen update with Nuance Design Build starts around $35,000. A fully customized kitchen, with premium cabinetry, quartz, quartzite or marble counters, upgraded lighting and a new layout, often runs $45,000 to $60,000 or more. Where yours lands depends on the cabinet material (Thermofoil, painted MDF, Egger or hardwood), the countertop, any plumbing changes, flooring that runs into the next rooms, built-in appliances and the lighting design. Settling the design early keeps the budget and the build in line, so the cost stays predictable.
At a standard finish, a 3-piece bathroom with a tub starts from $11,900, a 3-piece with a walk-in shower from $13,500, and a 4-piece master bathroom of 60 to 100 sq ft from $17,500. Bathrooms over 100 sq ft start from $20,000. Premium and luxury finishes raise each figure. Beyond size, the price follows layout changes, plumbing relocation, tile size and material, vanity customization, waterproofing and fixture quality. In older homes, problems hidden behind the existing finishes may need fixing first.
Design comes first. Nuance Design Build settles the design before construction starts and keeps design, budgeting and construction with one team, so the project can be priced accurately early on. We show you which elements add the most value (cabinetry, countertops, lighting, flooring transitions) and where extra spending won’t show. After the first consultation you get a detailed, transparent quote built around your priorities, with no hidden costs, and your project manager tracks the budget through construction.
Construction on a basement renovation in Richmond Hill, Markham, Vaughan or Toronto typically takes 6 to 10 weeks. The whole process, design and permits included, usually runs 2 to 4 months. Small cosmetic updates can finish sooner. Legal basements, secondary suites and jobs with plumbing or structural work can push construction closer to 10 to 12 weeks. Careful planning and a properly prepared permit application are what keep the schedule predictable once work begins.
Nuance Design Build visits your home. We talk about how you use the space today and what needs to change, and take the measurements needed to start the design accurately. We also look at layout options, structural limits and where the utilities run, so the project starts from a realistic direction rather than a wish list. From there we prepare a detailed, transparent quote for the full scope, worked out around your budget and priorities.
A basement suite is legal in Ontario if it is a self-contained unit (a secondary dwelling unit) that meets the Ontario Building Code and local zoning by-laws and has passed municipal permit inspections. It usually needs a separate entrance, a full kitchen with proper ventilation, a 3- or 4-piece bathroom, bedrooms with egress windows, fire-rated separation between units, an independent or properly balanced HVAC system, soundproofing, ESA-certified electrical, and interconnected smoke and CO alarms. Without permits, it cannot legally be rented.
Not every basement qualifies as it stands. Before anything is designed, Nuance Design Build runs a feasibility assessment of the ceiling height, the foundation and structure, existing plumbing and electrical capacity, the HVAC system, zoning eligibility and where a separate entrance could go. Some basements need larger windows or mechanical upgrades to comply. You get an honest answer at this stage, before you commit to design or permit drawings.
Yes. Nuance Design Build is fully licensed and insured. We carry WSIB coverage and $5 million in commercial liability insurance, which protects your home and investment for the whole renovation. Every project is professionally managed, with clear scheduling, daily coordination and supervision from demolition to final detailing, so workmanship, safety and cleanliness stay consistent at every stage.
Warranty terms are written into your contract. They keep our workmanship warranty, which covers how the work was built, separate from the manufacturers’ own warranties on products, fixtures and appliances. Every renovation finishes with detailing, a post-construction quality inspection and a final walkthrough before handover. Legal basement conversions also come with clear documentation of the approved work and ongoing support once the unit is complete.
Nuance Design Build works in 20 cities across the GTA: Richmond Hill, where we are based, plus Vaughan, Markham, Thornhill, King City, Downtown Toronto, North York, Scarborough, Etobicoke, Mississauga, Oakville, Burlington, Brampton, Pickering, Ajax, Whitby, Uxbridge, Aurora, Newmarket and Stouffville. We take on kitchens, bathrooms, basements (legal basement conversions included), home additions and full home renovations, as well as condo renovations and commercial fit-outs.
Still have a question?
Ask us directlyPeople also ask
Questions people across the GTA type into a search bar before they renovate, with short answers. Search them, or open one and follow where it leads.
23questions
If the lot and the house can take it, yes: an addition gets you more room without moving. You can build up with a storey, build out with a room or a few, or build new in the yard, and the design matches the house you already have.
People also ask
A well-built one is. Homes are categorized for pricing by their number of rooms, so an addition adds to what the house is worth as well as to its space. Matching the original house, and building the new rooms to last as long as the old, protects that value.
People also ask
Designers and architects. At Nuance Design Build they draw the addition to match the existing house, and the same firm then prices and builds it, so the drawings, the quote and the construction all come from one place.
People also ask
For most GTA homes, yes. Finishing the basement is the most cost-effective way to add usable square footage without making the house any bigger. A legal secondary suite can also bring in monthly rent that goes toward the mortgage, and a permitted unit appeals at resale to investors, multi-generational families and buyers looking to offset carrying costs.
People also ask
Size sets the starting price. After that, the cost depends on layout changes, plumbing relocation, tile size and material, vanity customization, waterproofing requirements and fixture quality. In older Toronto homes, problems behind the existing finishes often have to be corrected first (a floor levelled, plumbing adjusted), and that adds preparation time and cost.
People also ask
Home additions in Toronto average about $200 per square foot, and more involved work can go past $350 per square foot. A one-storey addition can start at around $300,000. Most of the money goes to labour, quality materials and professional design fees, and the size and complexity of the addition decide where it falls in that range.
People also ask
Good to know
What is different about additions in Markham: who reviews the work, which rules apply and the houses we tend to find. Every by-law links its source.
Every part of Markham falls under TRCA, the conservation authority for the Rouge and Don watersheds among others, so a ravine or creek lot here answers to TRCA. Its permit covers more than the addition's walls: building, changing the grade and placing fill each need one. The footings, ground reshaped around the new rooms and fill used to level the yard all go on the TRCA drawings. On a regulated lot we settle the footprint and the grading together before applying, since changing either afterwards means revising the application.
A lot inside a heritage conservation district has another approval to plan for. In the Unionville, Markham Village, Thornhill and Buttonville districts, an addition counts as new construction, which needs a Minor or Major Heritage Permit, and the design has to follow the district plan's guidelines. So the cladding and windows of the new rooms are chosen to suit the district as well as the house, and the heritage drawings are prepared alongside the building permit set.
Source: Toronto and Region Conservation Authority (opens in a new tab)Markham is regulated by 42 separate zoning by-laws, most of them passed before 1980, so the first question for an addition is which one covers your lot. Much of the city developed since 1995, including Cornell, Berczy, Wismer, Angus Glen, Box Grove and Cathedral Town, falls under By-law 177-96, with rules specific to each area. Older parts of the city sit under earlier by-laws, and many of those, particularly for areas developed before 1995, are not online or in digital form.
That sets the order of work. The setbacks, height and lot coverage the design must meet come from whichever by-law applies, so on a lot in an area developed before 1995 we confirm the limits with the City before drawing. Where a design can't fit, a minor variance comes before the permit.
Source: City of Markham (opens in a new tab)Book a consultation
We visit, take the measurements and talk through what you have in mind.
Get A Free Estimate
Track record
While we build
Where we build