Basement renovation · Richmond Hill, York Region

Basement renovationsin Richmond Hill.

Basement renovations in Richmond Hill, from family rooms to legal apartments with their own entrance. One local design-build team handles the drawings, the permit and the build, and we have already turned an unfinished Richmond Hill basement into a legal unit.

Basement suite kitchen with a white quartz island and bar stools, navy shaker cabinets, a wall-mounted TV and a window over the sink
Navy shaker corner cabinet with brass pulls over a white quartz counter beside the suite’s kitchen window

RoomLegal basement suite, Richmond Hill

DetailNavy shaker, brass pulls

Construction, typically
6 to 10wk
With design and permits
2 to 4mo
Our office is in town
Local
Projects completed
200+

What’s included

What’s includedin a basement renovation.

We finish Richmond Hill basements as family rooms, home gyms, offices, playrooms and guest bedrooms with a full bathroom, and convert them into legal apartments with a separate entrance, egress windows and fire separation.

A basement suite’s private walk-up entrance: concrete stairs down to the door behind a black-framed glass guard

Legal secondary suites (ADU)

A unit of its own, built to the province’s and municipality’s building rules so it’s legal to rent.

  • Separate entrance
  • Full kitchen and 3- or 4-piece bath
  • Egress windows, fire-rated separation
  • ESA electrical, interconnected alarms
Basement living and dining area with a table for six, a sofa and a treadmill under pot lights

Rooms the family will use

The layout keeps them bright and open, and the finishes follow the style upstairs.

  • Rec rooms and home theatres
  • Home offices and fitness rooms
  • In-law suites and guest bedrooms
  • Full bathrooms and laundry
Basement before finishing: insulation and vapour barrier on the walls, a steel beam across the open joists

Moisture, insulation & sound

We work these into the first drawing, since they decide if a basement is a comfortable home.

  • Moisture control and waterproofing
  • Insulation and vapour barriers
  • Soundproofing between floors
  • Lighting layout and ceiling design
Galley kitchen in a basement suite with navy shaker cabinets, a stainless range hood and white tile

Drawings, permits & inspections

We prepare and file the permit package, work with the municipality until it is approved, and book every inspection.

  • Architectural and structural drawings
  • HVAC and plumbing plans
  • Fire separation documentation
  • Inspections scheduled and passed

For a legal suite, we first assess

  • Ceiling height compliance
  • Foundation and structure
  • Plumbing and electrical capacity
  • HVAC adequacy
  • Zoning eligibility
  • Entrance location options

How it runs

How we executea legal basement conversion.

The five stages go in order, and each ends before the next.

First visit to handover, typically
17 to 18 weeks
  1. Step 1: Feasibility assessment

    Before any promise, we look at zoning, ceiling height, structure and services. 1 wk, from week 0.

  2. Step 2: Design and planning

    Comfort and rental appeal, balanced in a layout drawn to code. 2 wks, from week 1.

  3. Step 3: Permit application and drawings

    Until approval, we work with the city on drawings we draft and file. 3 to 5 wks, from week 3.

  4. Step 4: Construction and inspection management

    Each stage passes an inspection we book before the next begins. 10 to 12 wks, from week 6.

  5. Step 5: Final approval and warranty

    Your written warranty terms, official approval and clear paperwork. 1 wk, from week 16.

Dedicated project manager, start to finish

Timings are typical. Hatching marks where a step can run longer. Each job gets its own schedule.

Why build it legally

Why convert your basementthe legal way.

For a GTA homeowner, a basement suite built properly with permits ranks among the soundest investments.

  1. Basement living room with a linear electric fireplace under a wall-mounted TV, a crystal chandelier and a pale blue sofa

    Earn rental income

    Designed well, a legal apartment can earn monthly rent in the GTA’s rental market and help offset rising property costs and the mortgage.

  2. White vase of baby’s breath on a black marble side table against a fluted wall panel

    Increase property value

    Homes that have a permitted secondary unit draw multi-generational families, investors and buyers wanting help with carrying costs.

  3. Basement mid-build: framed walls and arched openings with insulation behind, under a new drywall ceiling

    Protect occupants and owners

    Fire separation, proper egress, ventilation and structural compliance protect tenants, family and the house itself.

  4. Basement after drywall: pot lights, an arched opening and lit wall niches, the new floor still under protection

    Avoid legal and insurance risks

    Unpermitted work can bring municipal fines, closure orders, resale problems and an insurer who won’t pay out.

Client reviews

Clients, in theirown words.

Google reviews from the homeowners and business owners we have built for.

Google reviews
They did a great job renovating my bathroom and creating one in my basement. Kevin was very easy to work with and was able to accommodate all our requests. Everything looks really good!
Gilbert Lam

Google reviewBathroom renovation

Nuance Construction did an amazing job on our custom bathroom addition on the 1st floor. The team was professional, punctual, and kept everything clean throughout the project. … They completed the work on time and within budget, which was a pleasant surprise. … The final result exceeded our expectations.
Alex Cheng

Google reviewBathroom addition

Kevin and his team helped me renovate my new home, which was done incredibly well. They're nice and easy to work with, and offered many suggestions to how my home could look like when I lack ideas. They pay good attention to details to …
Yuchen Li

Google reviewHome renovation

I recently had the pleasure of working with Nuance Design Build for our new office renovation project, and I must say that my experience with them was nothing short of outstanding. From the initial consultation to the final walk-through, their professionalism, craftsmanship, and attention to detail were truly impressive.
PeakForce

Google reviewOffice renovation

Kevin and his team were instrumental to bringing my condo redesign vision to life! They were professional, knowledgeable in their trades and maintained great communication. They were a pleasure to work with and I would work with them again!
Kerry Yuan

Google reviewCondo renovation

Kevin and his team completed a full renovation of our ensuite bathroom, shared bathroom, and laundry room and the results are amazing! Their craftsmanship and attention to detail really show in every part of the project. …
Andy Lam

Google reviewBathrooms and laundry

Just wrapped up our full home renovation with Kevin's team, what an amazing experience! Kevin and his crew made everything so easy from design to finish. The quality and craftsmanship completely exceeded our expectations. Couldn’t be happier with how our home turned out!
Alex Chen

Google reviewFull home renovation

Thank you for turning my bathroom into one of those magazine bathrooms. Also excellent work on remove popcorn ceiling and adding pot lights.
Miranda Guo

Google reviewBathroom renovation

I had an exceptional experience with the Nuance team. They were professional, transparent, and incredibly detail-oriented throughout the entire project. The workmanship was of the highest quality, communication was clear and consistent, and everything was completed on time as promised. I highly recommend Nuance Design Build for anyone looking for a reliable and trustworthy partner to bring their vision to reality.
jingjing wang

Google review

Highly recommend Kevin and his team! They recently helped us finish our sunroom, and the whole process was smooth from start to finish. He’s very knowledgeable, easy to communicate with, and has a great attitude. We’re really happy with the result.
Wenting LI

Google reviewSunroom

We just finished a full home renovation with Nuance! Kevin and his team made the whole process smooth—from design ideas to picking materials. The craftsmanship and quality blew us away. My wife and I couldn’t be happier with the results!
Fan Xu

Google reviewFull home renovation

Kevin and his team are true professionals. We had a wonderful experience working with them on our home renovation. highly recommend Kevin and his team !
LKD 2009

Google reviewHome renovation

Kevin and his team are very professional, dedicated and easy to approach to. They can always provide the best advice based on my needs. I would definitely recommend them to my friends.
Yuhe Wang

Google review

Kevin and team brought our visions to life. He understands our requests and relay the message to the team efficiently. Always ready to answer our questions/ concerns :)
Stephanie Lo

Google review

I am really so much happy for the work you and your team has done there is no complaints you have great friendly people to work with keep up and wish you great success in your future Thanks 🙏
jayanti patel

Google review

Reasonable price. All work finished on time. Efficient workers. Delivered what we expected.
Ella Lee

Google reviewBathroom remodeling

01

Selected projects

From the job siteto the finished room.

Each of these seven recent GTA renovations comes with a job-site photo, taken before the work or partway through it.

Projects
07
Communities
07

Basement lounge framed by a plaster arch: a navy shaker wet bar with a brass tap, open shelving, a cream bouclé armchair and display niches
The basement before the work: open joists overhead and insulation wrapped on the walls
BeforeOpen joists, bare walls

A lounge took over the basement. The household’s cat has a nook set into a wall, and there’s a custom wet bar plus a powder room. The owners let us design it our way.

Added
Wet bar, powder room
For the cat
A built-in nook
Powder room with a pill-shaped mirror between two disc sconces on a navy wall, over a cream vanity with brass pulls
Powder room, navy and brass

Charcoal kitchen with a black marble island and backsplash veined in white and gold, open shelving and cream bar stools
The same kitchen mid-job: stripped to the subfloor beneath the window and upper-cabinet wall
On siteDown to the subfloor

Full-height charcoal cabinets surround the island and matching backsplash, both in black marble whose white-and-gold veins wrap every face. The room is dark, but cream stools and the open shelves stop it feeling heavy.

Island
Wrapped in black marble
Cabinetry
Charcoal, floor to ceiling
The black marble backsplash behind a stainless range top, under charcoal fluted and slab cabinets
Marble backsplash, range wall

A long waterfall island in walnut and white quartz running toward the dining area, a crystal chandelier above
The pantry wall before the work: two freestanding cabinets on the dark floor that stayed
BeforeThe pantry wall, before

Walnut tones and warm white cabinets work with the dark floors that stayed. Both ends of the island finish in waterfall edges. Behind a big pocket door, custom pantry cabinetry extends into the living area, centred on open display shelves and a robot-vacuum bay.

Island
Waterfall edges, both ends
Pantry
Pocket door, robot-vacuum bay
Pantry cabinetry in warm white with lit open display shelving at its centre, beside the dining table
Pantry, open display shelving

Open-plan second floor: walnut lower cabinets and a bronze range hood run toward a bay window, wide-plank oak floor in afternoon light
The floor stripped mid-demolition, ceiling opened and the old stair exposed
On siteMid-demolition

Above the first floor, where the client’s parents live, we rebuilt two storeys. We took the laundry out of the kitchen, enlarged the third-floor terrace to take a new bathroom and reworked load-bearing structure to open up the plan.

Structure
Load-bearing walls modified
Added
Third-floor bathroom
Bathroom with a floating oak vanity, a backlit mirror shelf and wall-mounted brass taps, glass shower behind
Oak vanity, lit mirror shelf

Oak shaker double vanity with scalloped brass pulls under two arched brass mirrors and globe light bars
The ensuite before: yellow walls, a long granite vanity and beige floor tile
BeforeThe original ensuite

Frameless glass fronts a walk-in shower where the tub was; the water-closet partition is gone. Egger shaker panels, capped by Taj Mahal-style quartz, form the full-height storage, double vanity and makeup desk.

Removed
Tub, water-closet wall
Finish
Green tile, brushed gold
Close view of the oak shaker drawers and their scalloped brass pulls
Shaker drawers, scallop pulls

The finished addition: red brick and grey siding over a charcoal glass-panel garage door
The addition from above during framing, crew on the upper level
On siteFraming, from above

The old garage came down, a new basement was excavated beneath it and two levels went up on top: a full three-storey addition, with the garage moved to the front of the lot.

Added
About 1,200 sq ft
Levels
Basement plus two
Oak stair with a frameless glass railing inside the addition
Oak stair, glass railing

Bright ensuite: a walnut shaker vanity and makeup area under a scalloped mirror, a glass shower with a half wall, white wall mouldings
Looking down at the shower floor mid-install: herringbone mosaic, blue tape and levelling clips
On siteShower floor going in

Behind a pocket door, the bedroom entrance is now on the outside wall; the tub’s out. The vanity, slim shaker in walnut, holds one sink and a makeup area; the marble shower floor contrasts with antique-brass fixtures.

Layout
Entrance moved, pocket door
Fixtures
Antique brass
Antique-brass hand shower on white tile beside two recessed niches
Antique-brass hand shower
See every project

Where we work

Based in Richmond Hill.Building across the GTA.

Kitchens, bathrooms, basements, additions and whole-home renovations in York Region, Toronto, Peel, Halton and Durham. The rings show roughly how long the drive is from our office, outside rush hour.

Our office
Town we serve
Completed project
Drive time, off‑peak

Towns we serve

4 regions

Not on the list?

We take on projects across the Greater Toronto Area. Tell us where the house is and we’ll let you know.

Get A Free Estimate

Questions & answers

Basement renovation FAQsfor Richmond Hill.

Short answers on basement renovation in Richmond Hill. The Richmond Hill tab covers permits, local rules and the houses themselves, and the other tabs cover cost, timing and insurance.

A family finish and a legal unit are priced as different jobs. The unit adds fire separation, egress windows, its own entrance and usually a kitchen. In Richmond Hill the entrance can also bring a second permit: the City's site alteration exemption covers an added unit only if it is generally under 400 square feet and leaves surface drainage alone, so a walk-up that changes how the lot drains can need a site alteration permit and a grading plan. Ceiling height, the foundation and how far the plumbing has to run set the rest.

On site, a basement finish usually takes 6 to 10 weeks, or 2 to 4 months once design and permits are counted, and a legal unit runs nearer 10 to 12 weeks of construction. For the permit, Richmond Hill's service charter says you will hear back within 10 business days once a complete house application is in. What takes planning is getting the drawings complete, then the inspections we book as each stage is ready.

Yes. Richmond Hill lists finishing a basement as interior work that needs a building permit, rental unit or not, and the City inspects as the work goes. A legal apartment has more to meet on top of that: the City's additional unit by-law and the Ontario Building Code's fire separation and egress rules. We handle the drawings, the application and the inspection bookings.

Yes. The one on our projects page was finished in spring 2024: an unfinished Richmond Hill basement turned into a fully code-compliant legal unit for owners who planned to live downstairs and rent the floors above. Giving the unit independent access meant removing the stair to the main floor and building a new walk-up entrance in its place. Its kitchen, living and dining share one open space, and the full case study has the photos.

We start with a feasibility visit. In the basement we check the ceiling height, the foundation and structure, whether the existing plumbing, electrical and HVAC can carry more, and the options for a separate entrance. For a rental unit we also check the lot's zoning eligibility under Richmond Hill's additional unit rules, and whether a walk-up would change the drainage. Not every basement qualifies without changes, and we tell you before design starts.

Legal secondary suites, rec rooms, home offices, fitness rooms, kids’ playrooms, in-law suites, home theatres and guest bedrooms, with full bathrooms and laundry where you need them. We lay out each one so it feels like part of the house above.

We plan for both at the design stage. Every Nuance Design Build basement gets moisture control and waterproofing, proper insulation and vapour barriers, and soundproofing between floors, worked out alongside the lighting layout and ceiling design.

We check feasibility, design the suite to the Code and prepare the permit drawings. During construction we book every required inspection and each stage passes before the next starts. After the last inspection the unit is approved, with clear documentation of the approved work.

For a legal suite or structural work, yes: you need a building permit. Other jobs depend on the scope and your municipality. We prepare the structural and engineering drawings for the application, plus design concepts, mood boards and material selection.

Construction on a basement renovation in Richmond Hill, Markham, Vaughan or Toronto typically takes 6 to 10 weeks. The whole process, design and permits included, usually runs 2 to 4 months. Small cosmetic updates can finish sooner. Legal basements, secondary suites and jobs with plumbing or structural work can push construction closer to 10 to 12 weeks. Careful planning and a properly prepared permit application are what keep the schedule predictable once work begins.

It depends on the scope and the municipality. Structural changes, additions and legal basement suites need a building permit, and the application itself can depend on where the home is. Nuance Design Build prepares the drawings and paperwork, works through the by-laws and zoning rules with the city and stays on it until the permit is approved. During construction we schedule and manage every required inspection.

Not every basement qualifies as it stands. Before anything is designed, Nuance Design Build runs a feasibility assessment of the ceiling height, the foundation and structure, existing plumbing and electrical capacity, the HVAC system, zoning eligibility and where a separate entrance could go. Some basements need larger windows or mechanical upgrades to comply. You get an honest answer at this stage, before you commit to design or permit drawings.

A straightforward kitchen update with Nuance Design Build starts around $35,000. A fully customized kitchen, with premium cabinetry, quartz, quartzite or marble counters, upgraded lighting and a new layout, often runs $45,000 to $60,000 or more. Where yours lands depends on the cabinet material (Thermofoil, painted MDF, Egger or hardwood), the countertop, any plumbing changes, flooring that runs into the next rooms, built-in appliances and the lighting design. Settling the design early keeps the budget and the build in line, so the cost stays predictable.

At a standard finish, a 3-piece bathroom with a tub starts from $11,900, a 3-piece with a walk-in shower from $13,500, and a 4-piece master bathroom of 60 to 100 sq ft from $17,500. Bathrooms over 100 sq ft start from $20,000. Premium and luxury finishes raise each figure. Beyond size, the price follows layout changes, plumbing relocation, tile size and material, vanity customization, waterproofing and fixture quality. In older homes, problems hidden behind the existing finishes may need fixing first.

In Toronto, a one-storey addition can start at about $300,000. Costs average around $200 per square foot and can pass $350 per square foot for more involved work. Labour, quality materials and professional design fees are the largest costs, and the addition’s size and complexity decide where it lands in that range. Nuance Design Build offers a free consultation and cost estimate, and builds the addition on a single contract, from the first idea to the occupancy permit.

Design comes first. Nuance Design Build settles the design before construction starts and keeps design, budgeting and construction with one team, so the project can be priced accurately early on. We show you which elements add the most value (cabinetry, countertops, lighting, flooring transitions) and where extra spending won’t show. After the first consultation you get a detailed, transparent quote built around your priorities, with no hidden costs, and your project manager tracks the budget through construction.

Nuance Design Build visits your home. We talk about how you use the space today and what needs to change, and take the measurements needed to start the design accurately. We also look at layout options, structural limits and where the utilities run, so the project starts from a realistic direction rather than a wish list. From there we prepare a detailed, transparent quote for the full scope, worked out around your budget and priorities.

Every Nuance Design Build project has a dedicated project manager who is your single point of contact. They coordinate the trades, run the schedule, oversee quality and keep you informed through demolition, rough-in, installation, finishing and the final walkthrough. You get a detailed construction schedule, updates before you have to ask, budget tracking and quality-control inspections, so you never have to chase different people for answers.

Yes. Nuance Design Build is fully licensed and insured. We carry WSIB coverage and $5 million in commercial liability insurance, which protects your home and investment for the whole renovation. Every project is professionally managed, with clear scheduling, daily coordination and supervision from demolition to final detailing, so workmanship, safety and cleanliness stay consistent at every stage.

Warranty terms are written into your contract. They keep our workmanship warranty, which covers how the work was built, separate from the manufacturers’ own warranties on products, fixtures and appliances. Every renovation finishes with detailing, a post-construction quality inspection and a final walkthrough before handover. Legal basement conversions also come with clear documentation of the approved work and ongoing support once the unit is complete.

Nuance Design Build works in 20 cities across the GTA: Richmond Hill, where we are based, plus Vaughan, Markham, Thornhill, King City, Downtown Toronto, North York, Scarborough, Etobicoke, Mississauga, Oakville, Burlington, Brampton, Pickering, Ajax, Whitby, Uxbridge, Aurora, Newmarket and Stouffville. We take on kitchens, bathrooms, basements (legal basement conversions included), home additions and full home renovations, as well as condo renovations and commercial fit-outs.

Still have a question?

Ask us directly

People also ask

What homeowners searchbefore they call.

Questions people across the GTA type into a search bar before they renovate, with short answers. Search them, or open one and follow where it leads.

A legal basement is a basement apartment, or secondary suite, built to the Ontario Building Code and the local zoning by-law, with every permit inspection passed. Without permits the unit cannot legally be rented, and it may create insurance, resale or liability risks.

People also ask

Yes. A legal basement suite needs soundproofing assemblies between the floors and fire-rated separation between the two units. Nuance Design Build plans the soundproofing with the layout, then installs soundproofing insulation and fire-rated drywall during construction.

People also ask

Not always. A legal suite needs its own HVAC system or a properly balanced shared one, plus proper ventilation, often an HRV. Nuance Design Build checks the existing system at the feasibility stage and includes HVAC layouts in the permit drawings.

People also ask

For most GTA homes, yes. Finishing the basement is the most cost-effective way to add usable square footage without making the house any bigger. A legal secondary suite can also bring in monthly rent that goes toward the mortgage, and a permitted unit appeals at resale to investors, multi-generational families and buyers looking to offset carrying costs.

People also ask

Size sets the starting price. After that, the cost depends on layout changes, plumbing relocation, tile size and material, vanity customization, waterproofing requirements and fixture quality. In older Toronto homes, problems behind the existing finishes often have to be corrected first (a floor levelled, plumbing adjusted), and that adds preparation time and cost.

People also ask

Home additions in Toronto average about $200 per square foot, and more involved work can go past $350 per square foot. A one-storey addition can start at around $300,000. Most of the money goes to labour, quality materials and professional design fees, and the size and complexity of the addition decide where it falls in that range.

People also ask

Good to know

Basement renovation in Richmond Hill:good to know.

What is different about basements in Richmond Hill: who reviews the work, which rules apply and the houses we tend to find. Every by-law links its source.

Basement renovation permits in Richmond Hill

Because Richmond Hill treats a basement finish as permit work, the drawings come before the framing. For a family basement they show the layout, the insulation, any new bathroom's plumbing and the ductwork. For a legal unit we add the fire separation details, egress windows, the separate entrance and, where needed, structural details and HVAC layouts. The City then inspects in stages, and we book each visit as the work reaches it, so nothing is closed in before it has been seen.

Source: City of Richmond Hill (opens in a new tab)

Legal basement apartment rules in Richmond Hill

By-law 143-24 sets how many homes a Richmond Hill lot can hold: the main house plus up to three additional residential units, with no more than four dwelling units in total, each meeting the City's development standards. A basement apartment counts as one of those units. Inside, it is built as a separate home: a fire-rated separation from the floor above, interconnected smoke and CO alarms, egress windows for the bedrooms, its own entrance, ESA-certified electrical and a kitchen with proper ventilation.

Source: City of Richmond Hill (opens in a new tab)

Basement finishing in Richmond Hill without a unit

A basement finished for the family needs the same Richmond Hill permit but none of the unit rules, so the plan can follow how you will use it: a home gym, a theatre, a playroom, an office, a guest bedroom with a full bathroom, laundry and storage. Any damp in the walls is dealt with before they are insulated and closed in. Lighting and the ceiling are designed as one, which is what keeps a lower level bright and open.

Book a consultation

Find out what your basement can be.It starts with a visit.

We visit, take the measurements and talk through what you have in mind.

Get A Free Estimate

Track record

Years of experience
12+
Projects completed
200+

While we build

Workplace safety insurance
WSIB
Commercial liability insurance
$5M

Where we build

GTA cities, from our Richmond Hill office
20