Home additions · North York, Toronto

Home additionin North York.

Home additions in North York, each one sized to the by-law that governs the lot: a one-storey rear extension or a full second storey, built to look like part of the house. Drawings, approvals and construction all stay with our design-build team until the occupancy permit.

Aerial view of the addition framed in timber against the side of the house, walls up and roof framing started
Looking down into the framed addition: new walls and floor joists in fresh lumber

RoomFraming the addition, Uxbridge

DetailWalls and joists from above

One-storey additions from
$300k
Per sq ft, on average
$200
Or less from our office
30min
Projects completed
200+

What’s included

What’s includedin a home addition.

A North York addition can be a one-storey rear extension, a side addition or a second storey. The lot narrows the choice before design starts: its depth, nearby trees, any ravine edge and the zoning by-law that governs it.

Aerial view of a new addition’s walls framed off the side of the house

Add a room, or a few

On the ground floor, we add at the back or side so old and new rooms connect easily for movement, utilities and services.

  • Rear and side additions
  • Room extensions
  • Foundations and framing
  • Utilities tied into the house
Aerial view of an addition sheathed to its upper storey above the original roofline

Add a storey

As strong and long-lived as the floors under it: a second storey on your current house.

  • Second-storey additions
  • Structure for the new floor
  • Roof framing
  • Stairs to the new level
Roof trusses set on the framed walls of a new addition against a blue sky

A building in your yard

A separate building on your lot, designed and built by the same team that would extend the house itself.

  • Design and layout
  • Foundations and framing
  • Utilities and services
  • Finishing inside and out
Inside the finished addition: an oak stair with a frameless glass guard and an oak handrail

Design that matches, start to finish

Until the occupancy permit, one firm is in charge, and additions match the house in style and materials.

  • Style and materials matched
  • Designers and architects
  • Permits to occupancy
  • Non-stop internal communication

How it runs

From the first ideato the last occupancy permit.

All six steps sit under one contract. A dedicated project manager is the sole point of contact.

First visit to handover, typically
29 to 34 weeks
  1. Step 1: Site measurement

    We take every measurement at your home after hearing what you need. 1 wk, from week 0.

  2. Step 2: Design development

    Your ideas become buildable plans. We pick lasting materials. 4 to 6 wks, from week 1.

  3. Step 3: Detailed estimating

    Your budget shapes a clear quote, and no cost is hidden. 1 to 2 wks, from week 5.

  4. Step 4: Permit coordination

    We do the permit paperwork with the city, if your job needs one. 8 to 12 wks, from week 6.

  5. Step 5: Construction

    Trade scheduling and updates come from your project manager. 14 to 20 wks, from week 14.

  6. Step 6: Final walkthrough

    We finish, touch up and clean, then walk through every detail with you. 1 wk, from week 28.

Dedicated project manager, start to finish

Timings are typical. Hatching marks where a step can run longer. Each job gets its own schedule.

Why add on

The advantagesof a home addition.

A well-built addition is an investment in how your family lives now, and in the home’s future value.

  1. Aerial view of a two-storey addition sheathed in house wrap beside the original bungalow

    Increased property value

    Homes are priced by the number of rooms they have, so a well-built addition adds value as well as space.

  2. A skylight set into the white ceiling of the new addition, beside a pot light

    Increased living space

    Up, out or new: another storey on the house, one or more added rooms, or a detached building in the yard.

  3. Looking up at new rafters and a steel post at the corner of the addition, a ladder against the framing

    Custom room designs

    Your house sets the style and materials, and we plan each layout around utilities, services and easy movement.

  4. Foundation forms set in the excavation for the addition, a mini excavator behind the site fence

    Single contract, single source

    Your addition stays in one local design-build firm’s hands, start to occupancy permit, so no message is lost between companies.

Client reviews

Clients, in theirown words.

Google reviews from the homeowners and business owners we have built for.

Google reviews
They did a great job renovating my bathroom and creating one in my basement. Kevin was very easy to work with and was able to accommodate all our requests. Everything looks really good!
Gilbert Lam

Google reviewBathroom renovation

Nuance Construction did an amazing job on our custom bathroom addition on the 1st floor. The team was professional, punctual, and kept everything clean throughout the project. … They completed the work on time and within budget, which was a pleasant surprise. … The final result exceeded our expectations.
Alex Cheng

Google reviewBathroom addition

Kevin and his team helped me renovate my new home, which was done incredibly well. They're nice and easy to work with, and offered many suggestions to how my home could look like when I lack ideas. They pay good attention to details to …
Yuchen Li

Google reviewHome renovation

I recently had the pleasure of working with Nuance Design Build for our new office renovation project, and I must say that my experience with them was nothing short of outstanding. From the initial consultation to the final walk-through, their professionalism, craftsmanship, and attention to detail were truly impressive.
PeakForce

Google reviewOffice renovation

Kevin and his team were instrumental to bringing my condo redesign vision to life! They were professional, knowledgeable in their trades and maintained great communication. They were a pleasure to work with and I would work with them again!
Kerry Yuan

Google reviewCondo renovation

Kevin and his team completed a full renovation of our ensuite bathroom, shared bathroom, and laundry room and the results are amazing! Their craftsmanship and attention to detail really show in every part of the project. …
Andy Lam

Google reviewBathrooms and laundry

Just wrapped up our full home renovation with Kevin's team, what an amazing experience! Kevin and his crew made everything so easy from design to finish. The quality and craftsmanship completely exceeded our expectations. Couldn’t be happier with how our home turned out!
Alex Chen

Google reviewFull home renovation

Thank you for turning my bathroom into one of those magazine bathrooms. Also excellent work on remove popcorn ceiling and adding pot lights.
Miranda Guo

Google reviewBathroom renovation

I had an exceptional experience with the Nuance team. They were professional, transparent, and incredibly detail-oriented throughout the entire project. The workmanship was of the highest quality, communication was clear and consistent, and everything was completed on time as promised. I highly recommend Nuance Design Build for anyone looking for a reliable and trustworthy partner to bring their vision to reality.
jingjing wang

Google review

Highly recommend Kevin and his team! They recently helped us finish our sunroom, and the whole process was smooth from start to finish. He’s very knowledgeable, easy to communicate with, and has a great attitude. We’re really happy with the result.
Wenting LI

Google reviewSunroom

We just finished a full home renovation with Nuance! Kevin and his team made the whole process smooth—from design ideas to picking materials. The craftsmanship and quality blew us away. My wife and I couldn’t be happier with the results!
Fan Xu

Google reviewFull home renovation

Kevin and his team are true professionals. We had a wonderful experience working with them on our home renovation. highly recommend Kevin and his team !
LKD 2009

Google reviewHome renovation

Kevin and his team are very professional, dedicated and easy to approach to. They can always provide the best advice based on my needs. I would definitely recommend them to my friends.
Yuhe Wang

Google review

Kevin and team brought our visions to life. He understands our requests and relay the message to the team efficiently. Always ready to answer our questions/ concerns :)
Stephanie Lo

Google review

I am really so much happy for the work you and your team has done there is no complaints you have great friendly people to work with keep up and wish you great success in your future Thanks 🙏
jayanti patel

Google review

Reasonable price. All work finished on time. Efficient workers. Delivered what we expected.
Ella Lee

Google reviewBathroom remodeling

01

Selected projects

From the job siteto the finished room.

Seven recent renovations across the GTA. Each one is paired with a photo from the job, taken before or during the work.

Projects
07
Communities
07

The finished addition: red brick and grey siding over a charcoal glass-panel garage door
The addition from above during framing, crew on the upper level
On siteFraming, from above

The old garage came down, a new basement was excavated beneath it and two levels went up on top: a full three-storey addition, with the garage moved to the front of the lot.

Added
About 1,200 sq ft
Levels
Basement plus two
Oak stair with a frameless glass railing inside the addition
Oak stair, glass railing

Charcoal kitchen with a black marble island and backsplash veined in white and gold, open shelving and cream bar stools
The same kitchen mid-job: stripped to the subfloor beneath the window and upper-cabinet wall
On siteDown to the subfloor

An island and backsplash in black marble, veined in white and gold across every face, are framed by floor-to-ceiling charcoal cabinetry. Open shelves and cream stools mean the dark room doesn’t feel heavy.

Island
Wrapped in black marble
Cabinetry
Charcoal, floor to ceiling
The black marble backsplash behind a stainless range top, under charcoal fluted and slab cabinets
Marble backsplash, range wall

A long waterfall island in walnut and white quartz running toward the dining area, a crystal chandelier above
The pantry wall before the work: two freestanding cabinets on the dark floor that stayed
BeforeThe pantry wall, before

Walnut tones and warm white cabinets work with the dark floors that stayed. Both ends of the island finish in waterfall edges. Behind a big pocket door, custom pantry cabinetry extends into the living area, centred on open display shelves and a robot-vacuum bay.

Island
Waterfall edges, both ends
Pantry
Pocket door, robot-vacuum bay
Pantry cabinetry in warm white with lit open display shelving at its centre, beside the dining table
Pantry, open display shelving

Open-plan second floor: walnut lower cabinets and a bronze range hood run toward a bay window, wide-plank oak floor in afternoon light
The floor stripped mid-demolition, ceiling opened and the old stair exposed
On siteMid-demolition

Above the first floor, where the client’s parents live, we rebuilt two storeys. We took the laundry out of the kitchen, enlarged the third-floor terrace to take a new bathroom and reworked load-bearing structure to open up the plan.

Structure
Load-bearing walls modified
Added
Third-floor bathroom
Bathroom with a floating oak vanity, a backlit mirror shelf and wall-mounted brass taps, glass shower behind
Oak vanity, lit mirror shelf

Basement lounge framed by a plaster arch: a navy shaker wet bar with a brass tap, open shelving, a cream bouclé armchair and display niches
The basement before the work: open joists overhead and insulation wrapped on the walls
BeforeOpen joists, bare walls

Now a lounge, the basement holds a custom wet bar, a powder room and a wall nook for the household’s cat. The owners left the design entirely up to us.

Added
Wet bar, powder room
For the cat
A built-in nook
Powder room with a pill-shaped mirror between two disc sconces on a navy wall, over a cream vanity with brass pulls
Powder room, navy and brass

Oak shaker double vanity with scalloped brass pulls under two arched brass mirrors and globe light bars
The ensuite before: yellow walls, a long granite vanity and beige floor tile
BeforeThe original ensuite

The tub is now a walk-in shower with frameless glass, and the toilet is no longer walled in. Taj Mahal-style quartz tops Egger shaker panels on the double vanity, the makeup desk and the full-height storage.

Removed
Tub, water-closet wall
Finish
Green tile, brushed gold
Close view of the oak shaker drawers and their scalloped brass pulls
Shaker drawers, scallop pulls

Bright ensuite: a walnut shaker vanity and makeup area under a scalloped mirror, a glass shower with a half wall, white wall mouldings
Looking down at the shower floor mid-install: herringbone mosaic, blue tape and levelling clips
On siteShower floor going in

The tub is gone, and the bedroom entrance, now on the exterior wall, has a pocket door. In the shower, marble underfoot meets antique-brass fixtures; the walnut slim-shaker vanity puts one sink beside a makeup area.

Layout
Entrance moved, pocket door
Fixtures
Antique brass
Antique-brass hand shower on white tile beside two recessed niches
Antique-brass hand shower
See every project

Where we work

Based in Richmond Hill.Building across the GTA.

Kitchens, bathrooms, basements, additions and whole-home renovations in York Region, Toronto, Peel, Halton and Durham. The rings show roughly how long the drive is from our office, outside rush hour.

Our office
Town we serve
Completed project
Drive time, off‑peak

Towns we serve

4 regions

Not on the list?

Once we know where the house is, we can tell you. Our projects take us around the Greater Toronto Area.

Get A Free Estimate

Questions & answers

Home additions FAQsfor North York.

Short answers on home additions in North York. The North York tab covers permits, local rules and the houses themselves, and the other tabs cover cost, timing and insurance.

The price follows the design, and in parts of North York the shape of the lot decides the design. Don Mills put its houses on square lots facing the street with their long side, which leaves less depth behind them. On a lot like that, a large rear addition may not fit, and going up or to the side costs differently: a second storey needs the existing walls and foundation checked for the extra load, and reinforced where they fall short, while a side addition needs a foundation of its own. Finishes and the size of the new rooms set the rest.

Construction takes 14 to 20 weeks, and on our usual timings the approvals in front of it, 8 to 12 weeks, take longer than the design. In North York the lot decides how many approvals that stage holds. In Bayview Village, some houses stand on ravine lots overlooking the East Don River Valley Parklands, and on a lot like that the excavation and new structure need Toronto’s ravine permit, while TRCA, which counts an addition as development, has to give its permit or clearance before the City issues the building permit. Away from the ravines and valleys, that stage usually comes down to the building permit and, where a large tree is close, a tree permit.

Yes. Every North York addition needs the City of Toronto’s building permit, reviewed at Toronto Building’s North York District, and the drawings must show it meets the zoning that applies to your lot. Some lots add a ravine permit or a tree permit to that, and we look for both before design.

It can, if the structure below will carry it and the zoning for the lot allows the height. Willowdale’s older housing includes modest postwar houses of one and a half storeys, whose upper rooms sit under sloped ceilings inside the original roof. Turning that half storey into a full one usually means removing the roof and framing new walls to full height, and an engineer checks the main-floor walls and foundation for the added load first. The new floor is then drawn to match the house below it.

They can, if a large tree is close to the work. Toronto’s Tree Protection By-law prohibits work that could injure or remove a privately owned tree with a trunk 30 cm across or more, unless a permit allows it, and a foundation dug near one can injure its roots even when the trunk is untouched. So before the footprint is final we note every tree near it. Where one is close, the permit comes before excavation, and it can shift both where the addition sits and when work starts.

Three kinds. Second-storey additions build up, rear and side additions build out on the ground floor, and a separate building can go in the yard. All three are designed to match the style and materials of the house.

Yes. Our designers and architects match your home’s style and materials so old and new blend, and the new space is built to last as long as the house it joins.

Yes. In Toronto the building permit comes from Toronto Building, and the drawings must show the addition meets the zoning. We prepare the drawings and applications, deal with the city on by-laws and zoning, and carry the job to the occupancy permit.

Size and complexity set the cost, and labour, quality materials and professional design fees are usually the biggest expenses. In Toronto, additions average around $200 per square foot and can rise past $350 for more intricate work.

In Toronto, a one-storey addition can start at about $300,000. Costs average around $200 per square foot and can pass $350 per square foot for more involved work. Labour, quality materials and professional design fees are the largest costs, and the addition’s size and complexity decide where it lands in that range. Nuance Design Build offers a free consultation and cost estimate, and builds the addition on a single contract, from the first idea to the occupancy permit.

Every Nuance Design Build project has a dedicated project manager who is your single point of contact. They coordinate the trades, run the schedule, oversee quality and keep you informed through demolition, rough-in, installation, finishing and the final walkthrough. You get a detailed construction schedule, updates before you have to ask, budget tracking and quality-control inspections, so you never have to chase different people for answers.

It depends on the scope and the municipality. Structural changes, additions and legal basement suites need a building permit, and the application itself can depend on where the home is. Nuance Design Build prepares the drawings and paperwork, works through the by-laws and zoning rules with the city and stays on it until the permit is approved. During construction we schedule and manage every required inspection.

A straightforward kitchen update with Nuance Design Build starts around $35,000. A fully customized kitchen, with premium cabinetry, quartz, quartzite or marble counters, upgraded lighting and a new layout, often runs $45,000 to $60,000 or more. Where yours lands depends on the cabinet material (Thermofoil, painted MDF, Egger or hardwood), the countertop, any plumbing changes, flooring that runs into the next rooms, built-in appliances and the lighting design. Settling the design early keeps the budget and the build in line, so the cost stays predictable.

At a standard finish, a 3-piece bathroom with a tub starts from $11,900, a 3-piece with a walk-in shower from $13,500, and a 4-piece master bathroom of 60 to 100 sq ft from $17,500. Bathrooms over 100 sq ft start from $20,000. Premium and luxury finishes raise each figure. Beyond size, the price follows layout changes, plumbing relocation, tile size and material, vanity customization, waterproofing and fixture quality. In older homes, problems hidden behind the existing finishes may need fixing first.

Design comes first. Nuance Design Build settles the design before construction starts and keeps design, budgeting and construction with one team, so the project can be priced accurately early on. We show you which elements add the most value (cabinetry, countertops, lighting, flooring transitions) and where extra spending won’t show. After the first consultation you get a detailed, transparent quote built around your priorities, with no hidden costs, and your project manager tracks the budget through construction.

Construction on a basement renovation in Richmond Hill, Markham, Vaughan or Toronto typically takes 6 to 10 weeks. The whole process, design and permits included, usually runs 2 to 4 months. Small cosmetic updates can finish sooner. Legal basements, secondary suites and jobs with plumbing or structural work can push construction closer to 10 to 12 weeks. Careful planning and a properly prepared permit application are what keep the schedule predictable once work begins.

Nuance Design Build visits your home. We talk about how you use the space today and what needs to change, and take the measurements needed to start the design accurately. We also look at layout options, structural limits and where the utilities run, so the project starts from a realistic direction rather than a wish list. From there we prepare a detailed, transparent quote for the full scope, worked out around your budget and priorities.

Not every basement qualifies as it stands. Before anything is designed, Nuance Design Build runs a feasibility assessment of the ceiling height, the foundation and structure, existing plumbing and electrical capacity, the HVAC system, zoning eligibility and where a separate entrance could go. Some basements need larger windows or mechanical upgrades to comply. You get an honest answer at this stage, before you commit to design or permit drawings.

Yes. Nuance Design Build is fully licensed and insured. We carry WSIB coverage and $5 million in commercial liability insurance, which protects your home and investment for the whole renovation. Every project is professionally managed, with clear scheduling, daily coordination and supervision from demolition to final detailing, so workmanship, safety and cleanliness stay consistent at every stage.

Warranty terms are written into your contract. They keep our workmanship warranty, which covers how the work was built, separate from the manufacturers’ own warranties on products, fixtures and appliances. Every renovation finishes with detailing, a post-construction quality inspection and a final walkthrough before handover. Legal basement conversions also come with clear documentation of the approved work and ongoing support once the unit is complete.

Nuance Design Build works in 20 cities across the GTA: Richmond Hill, where we are based, plus Vaughan, Markham, Thornhill, King City, Downtown Toronto, North York, Scarborough, Etobicoke, Mississauga, Oakville, Burlington, Brampton, Pickering, Ajax, Whitby, Uxbridge, Aurora, Newmarket and Stouffville. We take on kitchens, bathrooms, basements (legal basement conversions included), home additions and full home renovations, as well as condo renovations and commercial fit-outs.

Still have a question?

Ask us directly

People also ask

What homeowners searchbefore they call.

Questions people across the GTA type into a search bar before they renovate, with short answers. Search them, or open one and follow where it leads.

If the lot and the house can take it, yes: an addition gets you more room without moving. You can build up with a storey, build out with a room or a few, or build new in the yard, and the design matches the house you already have.

People also ask

A well-built one is. Homes are categorized for pricing by their number of rooms, so an addition adds to what the house is worth as well as to its space. Matching the original house, and building the new rooms to last as long as the old, protects that value.

People also ask

Designers and architects. At Nuance Design Build they draw the addition to match the existing house, and the same firm then prices and builds it, so the drawings, the quote and the construction all come from one place.

People also ask

For most GTA homes, yes. Finishing the basement is the most cost-effective way to add usable square footage without making the house any bigger. A legal secondary suite can also bring in monthly rent that goes toward the mortgage, and a permitted unit appeals at resale to investors, multi-generational families and buyers looking to offset carrying costs.

People also ask

Size sets the starting price. After that, the cost depends on layout changes, plumbing relocation, tile size and material, vanity customization, waterproofing requirements and fixture quality. In older Toronto homes, problems behind the existing finishes often have to be corrected first (a floor levelled, plumbing adjusted), and that adds preparation time and cost.

People also ask

Home additions in Toronto average about $200 per square foot, and more involved work can go past $350 per square foot. A one-storey addition can start at around $300,000. Most of the money goes to labour, quality materials and professional design fees, and the size and complexity of the addition decide where it falls in that range.

People also ask

Good to know

Home additions in North York:good to know.

What is different about additions in North York: who reviews the work, which rules apply and the houses we tend to find. Every by-law links its source.

Home addition permits in North York

The first permit question for a North York addition is which zoning by-law the drawings have to meet. Here they can answer to two at once: Toronto’s city-wide 569-2013 and, depending on the property, former North York By-law 7625, which the city-wide by-law has not fully replaced. We check the address against both before the footprint is drawn. Under our single contract every application after that is ours to prepare, and the job stays with us until the occupancy permit is issued.

Source: City of Toronto (opens in a new tab)

A rear extension under the former North York by-law

On a lot still under former North York Zoning By-law 7625, the R3, R4 and R5 zones cap a house’s length at 16.8 m and allow 2.1 m more, to 18.9 m, for a one-storey extension at the rear. That extension can be no wider than half the house at its widest point, must keep a side yard of at least 3.0 m on each side and can rise no higher than 5.0 m. Those limits suit a modest family room or kitchen bump-out more than a full-width addition. Anything larger means a second storey, a different footprint or a variance, and we tell you which before design begins.

Source: City of Toronto (opens in a new tab)

Book a consultation

Build up, build out, or build new.It starts with a visit.

We visit, take the measurements and talk through what you have in mind.

Get A Free Estimate

Track record

Years of experience
12+
Projects completed
200+

While we build

Workplace safety insurance
WSIB
Commercial liability insurance
$5M

Where we build

GTA cities, from our Richmond Hill office
20