Kitchen renovation · Markham, York Region

Kitchen renovationin Markham.

Kitchen renovation in Markham, from new cabinets and counters in the same layout to a kitchen opened through a bearing wall. One design-build team plans and prices it with you in a detailed estimate, then builds it with a dedicated project manager from first visit to final walkthrough.

Kitchen with a sage-green island and white swivel stools under globe pendants, a white range hood banded in brass and a marble backsplash between two windows
Sage-green panelled island with a white swivel stool and a brushed-gold faucet

RoomSage island kitchen

DetailSage panelling, brushed gold

Kitchen updates from
$35k
Fully custom, often
$45k+
Or less from our office
30min
Projects completed
200+

What’s included

What’s includedin a kitchen renovation.

A kitchen renovation in Markham with us replaces the cabinetry, counters, backsplash, floor and lighting, and reaches behind the walls when the new plan moves the sink or joins the kitchen to the family room.

Open kitchen and dining area with a long island and bar stools, dark and white cabinetry and oak shelving

Layout & space planning

Before anything is built, we pin down where you prep, how storage should work and how people get around the island.

  • Layout adjustments
  • Island and work-zone planning
  • Appliance positioning
  • Plumbing changes where needed
Lit glass-front display cabinets beside a walnut range hood, over white Shaker drawers with brass pulls

Custom cabinet installation

Slim Shaker doors, modern slab fronts or detailed trim, laid out for everyday use with clean proportions.

  • Full-height pantry systems
  • Deep storage drawers
  • Integrated appliance panels
  • Hidden waste and coffee stations
White quartz waterfall island with black stools under three black pendants

Countertops & backsplash

Quartz, porcelain and other durable surfaces, chosen for wear, upkeep and looks, with every edge and seam planned in advance.

  • Quartz, quartzite and marble
  • Waterfall islands
  • Backsplash continuity
  • Edge profiles and sink integration
Beamed kitchen and dining room lit by woven pendants, a black chandelier and wall sconces

Lighting & electrical

We layer the lighting, plan switches for practical use and upgrade the wiring for modern appliances and islands.

  • Pot lights and pendants
  • Under-cabinet LED and puck lights
  • Island outlets
  • Appliance circuits

Before any work begins, we evaluate

  • Traffic flow
  • Appliance positioning
  • Cabinet accessibility
  • Natural lighting
  • Connection to surrounding rooms

How it runs

A kitchen renovation,stress free.

Four stages, each finished before the next begins, with you informed throughout.

First visit to handover, typically
9 to 10 weeks
  1. Step 1: Consultation and site visit

    Seeing how your kitchen is used and what the house permits. 1 wk, from week 0.

  2. Step 2: Design and material selection

    Counters, cabinets, lighting, backsplash and flooring, chosen together. 3 to 4 wks, from week 1.

  3. Step 3: Construction and daily management

    From demolition on, each phase is scheduled and managed daily. 4 to 6 wks, from week 4.

  4. Step 4: Final detailing and delivery

    Aligned, touched up and cleaned, the work gets a final look with you. 1 wk, from week 8.

Dedicated project manager, start to finish

Steps can run into the hatching. The times shown are typical, and no two jobs share a schedule.

Pricing is provided for general budgeting purposes only. Final costs depend on the project scope, materials, structural requirements, site conditions, and selected finishes. A detailed estimate will be provided following project assessment.

Why Nuance

Why homeowners choose usfor their kitchen.

Design and construction stay with one team, so every decision is made with both in mind.

  1. White kitchen with a lit quartz waterfall island, leather bar stools, glass-front display cabinets and a dark stone wall behind the range

    In-house design and build

    Technical work, site coordination, layout and materials are aligned from day one. Communication speeds up and surprises drop.

  2. Greige shaker kitchen with a brass faucet under the window and a black iron chandelier over the dining corner

    Transparent budget planning

    We point out where to save and where spending goes furthest, whether on flooring, cabinetry, lighting, countertops or appliances.

  3. Kitchen with flat white uppers, pale oak lowers, a black fridge and a white quartz island with linen stools

    Fully insured, professionally managed

    Clear scheduling and daily supervision at every stage, with $5 million liability insurance and WSIB coverage.

  4. Built-in coffee station between tall shaker pantry cabinets, with walnut floating shelves and an espresso machine

    Craftsmanship in the details

    Balanced lighting, even grout, neat shifts from one material to the next, clean edges and cabinets lined up. These details set how refined the room feels.

Client reviews

Clients, in theirown words.

Google reviews from the homeowners and business owners we have built for.

Google reviews
They did a great job renovating my bathroom and creating one in my basement. Kevin was very easy to work with and was able to accommodate all our requests. Everything looks really good!
Gilbert Lam

Google reviewBathroom renovation

Nuance Construction did an amazing job on our custom bathroom addition on the 1st floor. The team was professional, punctual, and kept everything clean throughout the project. … They completed the work on time and within budget, which was a pleasant surprise. … The final result exceeded our expectations.
Alex Cheng

Google reviewBathroom addition

Kevin and his team helped me renovate my new home, which was done incredibly well. They're nice and easy to work with, and offered many suggestions to how my home could look like when I lack ideas. They pay good attention to details to …
Yuchen Li

Google reviewHome renovation

I recently had the pleasure of working with Nuance Design Build for our new office renovation project, and I must say that my experience with them was nothing short of outstanding. From the initial consultation to the final walk-through, their professionalism, craftsmanship, and attention to detail were truly impressive.
PeakForce

Google reviewOffice renovation

Kevin and his team were instrumental to bringing my condo redesign vision to life! They were professional, knowledgeable in their trades and maintained great communication. They were a pleasure to work with and I would work with them again!
Kerry Yuan

Google reviewCondo renovation

Kevin and his team completed a full renovation of our ensuite bathroom, shared bathroom, and laundry room and the results are amazing! Their craftsmanship and attention to detail really show in every part of the project. …
Andy Lam

Google reviewBathrooms and laundry

Just wrapped up our full home renovation with Kevin's team, what an amazing experience! Kevin and his crew made everything so easy from design to finish. The quality and craftsmanship completely exceeded our expectations. Couldn’t be happier with how our home turned out!
Alex Chen

Google reviewFull home renovation

Thank you for turning my bathroom into one of those magazine bathrooms. Also excellent work on remove popcorn ceiling and adding pot lights.
Miranda Guo

Google reviewBathroom renovation

I had an exceptional experience with the Nuance team. They were professional, transparent, and incredibly detail-oriented throughout the entire project. The workmanship was of the highest quality, communication was clear and consistent, and everything was completed on time as promised. I highly recommend Nuance Design Build for anyone looking for a reliable and trustworthy partner to bring their vision to reality.
jingjing wang

Google review

Highly recommend Kevin and his team! They recently helped us finish our sunroom, and the whole process was smooth from start to finish. He’s very knowledgeable, easy to communicate with, and has a great attitude. We’re really happy with the result.
Wenting LI

Google reviewSunroom

We just finished a full home renovation with Nuance! Kevin and his team made the whole process smooth—from design ideas to picking materials. The craftsmanship and quality blew us away. My wife and I couldn’t be happier with the results!
Fan Xu

Google reviewFull home renovation

Kevin and his team are true professionals. We had a wonderful experience working with them on our home renovation. highly recommend Kevin and his team !
LKD 2009

Google reviewHome renovation

Kevin and his team are very professional, dedicated and easy to approach to. They can always provide the best advice based on my needs. I would definitely recommend them to my friends.
Yuhe Wang

Google review

Kevin and team brought our visions to life. He understands our requests and relay the message to the team efficiently. Always ready to answer our questions/ concerns :)
Stephanie Lo

Google review

I am really so much happy for the work you and your team has done there is no complaints you have great friendly people to work with keep up and wish you great success in your future Thanks 🙏
jayanti patel

Google review

Reasonable price. All work finished on time. Efficient workers. Delivered what we expected.
Ella Lee

Google reviewBathroom remodeling

01

Selected projects

From the job siteto the finished room.

Each of these seven recent GTA renovations comes with a job-site photo, taken before the work or partway through it.

Projects
07
Communities
07

A long waterfall island in walnut and white quartz running toward the dining area, a crystal chandelier above
The pantry wall before the work: two freestanding cabinets on the dark floor that stayed
BeforeThe pantry wall, before

Walnut tones and warm white cabinets work with the dark floors that stayed. Both ends of the island finish in waterfall edges. Behind a big pocket door, custom pantry cabinetry extends into the living area, centred on open display shelves and a robot-vacuum bay.

Island
Waterfall edges, both ends
Pantry
Pocket door, robot-vacuum bay
Pantry cabinetry in warm white with lit open display shelving at its centre, beside the dining table
Pantry, open display shelving

Charcoal kitchen with a black marble island and backsplash veined in white and gold, open shelving and cream bar stools
The same kitchen mid-job: stripped to the subfloor beneath the window and upper-cabinet wall
On siteDown to the subfloor

Charcoal cabinetry runs floor to ceiling around a black marble island and a matching backsplash, the white-and-gold veining carried across every face. Open shelving and cream stools keep the dark room from feeling heavy.

Island
Wrapped in black marble
Cabinetry
Charcoal, floor to ceiling
The black marble backsplash behind a stainless range top, under charcoal fluted and slab cabinets
Marble backsplash, range wall

Open-plan second floor: walnut lower cabinets and a bronze range hood run toward a bay window, wide-plank oak floor in afternoon light
The floor stripped mid-demolition, ceiling opened and the old stair exposed
On siteMid-demolition

Above the first floor, where the client’s parents live, we rebuilt two storeys. We took the laundry out of the kitchen, enlarged the third-floor terrace to take a new bathroom and reworked load-bearing structure to open up the plan.

Structure
Load-bearing walls modified
Added
Third-floor bathroom
Bathroom with a floating oak vanity, a backlit mirror shelf and wall-mounted brass taps, glass shower behind
Oak vanity, lit mirror shelf

Basement lounge framed by a plaster arch: a navy shaker wet bar with a brass tap, open shelving, a cream bouclé armchair and display niches
The basement before the work: open joists overhead and insulation wrapped on the walls
BeforeOpen joists, bare walls

The owners gave the design free rein. Their basement became a lounge with a custom wet bar and a powder room, plus a nook built into the wall for the household’s cat.

Added
Wet bar, powder room
For the cat
A built-in nook
Powder room with a pill-shaped mirror between two disc sconces on a navy wall, over a cream vanity with brass pulls
Powder room, navy and brass

Oak shaker double vanity with scalloped brass pulls under two arched brass mirrors and globe light bars
The ensuite before: yellow walls, a long granite vanity and beige floor tile
BeforeThe original ensuite

Frameless glass fronts a walk-in shower where the tub was; the water-closet partition is gone. Egger shaker panels, capped by Taj Mahal-style quartz, form the full-height storage, double vanity and makeup desk.

Removed
Tub, water-closet wall
Finish
Green tile, brushed gold
Close view of the oak shaker drawers and their scalloped brass pulls
Shaker drawers, scallop pulls

The finished addition: red brick and grey siding over a charcoal glass-panel garage door
The addition from above during framing, crew on the upper level
On siteFraming, from above

Three full storeys now stand where the old garage was. It was demolished, a new basement dug underneath and two levels built above. The garage was relocated to the front.

Added
About 1,200 sq ft
Levels
Basement plus two
Oak stair with a frameless glass railing inside the addition
Oak stair, glass railing

Bright ensuite: a walnut shaker vanity and makeup area under a scalloped mirror, a glass shower with a half wall, white wall mouldings
Looking down at the shower floor mid-install: herringbone mosaic, blue tape and levelling clips
On siteShower floor going in

The tub is gone, and the bedroom entrance, now on the exterior wall, has a pocket door. In the shower, marble underfoot meets antique-brass fixtures; the walnut slim-shaker vanity puts one sink beside a makeup area.

Layout
Entrance moved, pocket door
Fixtures
Antique brass
Antique-brass hand shower on white tile beside two recessed niches
Antique-brass hand shower
See every project

Where we work

Based in Richmond Hill.Building across the GTA.

Kitchens, bathrooms, basements, additions and whole-home renovations in York Region, Toronto, Peel, Halton and Durham. The rings show roughly how long the drive is from our office, outside rush hour.

Our office
Town we serve
Completed project
Drive time, off‑peak

Towns we serve

4 regions

Not on the list?

The Greater Toronto Area is where we take on projects. If you send the house’s location, we’ll answer.

Get A Free Estimate

Questions & answers

Kitchen renovation FAQsfor Markham.

Short answers on kitchen renovation in Markham. The Markham tab covers permits, local rules and the houses themselves, and the other tabs cover cost, timing and insurance.

We price a Markham kitchen from drawings, in a detailed estimate, and here two things shape it before any finish is chosen. One is the kitchen you start from: much of Markham is subdivision housing built from the mid-1970s on, so many jobs begin by taking out the builder's original cabinets, counter and floor. The other is structure. The City's permit list names columns as well as structural walls, so a kitchen opened to the family room is priced with its beam, any new column and the engineer's drawings. The finishes you pick are then priced line by line.

About 9 to 10 weeks from our first visit to handover, with 4 to 6 of those weeks on site. Structure is what stretches a Markham kitchen. Taking out or altering a bearing wall needs a City building permit, so the structural drawings and the permit review have to be finished before demolition. A cabinet-and-counter kitchen in the same layout skips that step.

Yes, if the work touches structure. Adding, removing or altering a structural wall or column in Markham needs a building permit, which is the usual reason a kitchen opened to the next room needs one. Replacing the cupboards does not. If yours needs a permit, we prepare the drawings and file the application as part of the job.

In phases: demolition, rough-in, installation, then finishing and detailing, each one scheduled and managed daily by your project manager. On a Markham kitchen that opens a bearing wall, the structural work comes first under the permit, before any cabinet goes in. The kitchen is out of use for the 4 to 6 weeks of construction, and you get the dates ahead of time so you can plan meals around them.

They can. A Markham kitchen that is still the builder's original may have plumbing that needs adjusting before the new finishes go in. At the site visit we look at utility locations and structural limits, so what can be seen is priced in the detailed estimate before work starts, and you are kept informed if opening the walls turns up more.

It covers layout planning, custom cabinet installation, countertops and backsplash, lighting and electrical upgrades, and flooring, all designed and built by one team. We manage every stage ourselves, from demolition and rough-in through installation, finishing and final detailing.

Yes. We plan layout changes from what we see at the site visit: how people move through the kitchen, where the appliances sit and how the room connects to the rest of the house. Moving plumbing adds cost, so those changes are decided early, with the budget in view.

We install quartz, quartzite, marble, porcelain and other durable surfaces, chosen for performance, upkeep and style. Waterfall islands, edge profiles, the sink and a backsplash that continues the counter are planned together, so the whole surface reads as one piece.

About 9 to 10 weeks from the first visit to handover. The site visit, design and material selection take the first four weeks or so, then construction runs 4 to 6 weeks, with final detailing at the end. Those are typical estimates; your scope sets the real schedule.

A straightforward kitchen update with Nuance Design Build starts around $35,000. A fully customized kitchen, with premium cabinetry, quartz, quartzite or marble counters, upgraded lighting and a new layout, often runs $45,000 to $60,000 or more. Where yours lands depends on the cabinet material (Thermofoil, painted MDF, Egger or hardwood), the countertop, any plumbing changes, flooring that runs into the next rooms, built-in appliances and the lighting design. Settling the design early keeps the budget and the build in line, so the cost stays predictable.

Design comes first. Nuance Design Build settles the design before construction starts and keeps design, budgeting and construction with one team, so the project can be priced accurately early on. We show you which elements add the most value (cabinetry, countertops, lighting, flooring transitions) and where extra spending won’t show. After the first consultation you get a detailed, transparent quote built around your priorities, with no hidden costs, and your project manager tracks the budget through construction.

Nuance Design Build visits your home. We talk about how you use the space today and what needs to change, and take the measurements needed to start the design accurately. We also look at layout options, structural limits and where the utilities run, so the project starts from a realistic direction rather than a wish list. From there we prepare a detailed, transparent quote for the full scope, worked out around your budget and priorities.

At a standard finish, a 3-piece bathroom with a tub starts from $11,900, a 3-piece with a walk-in shower from $13,500, and a 4-piece master bathroom of 60 to 100 sq ft from $17,500. Bathrooms over 100 sq ft start from $20,000. Premium and luxury finishes raise each figure. Beyond size, the price follows layout changes, plumbing relocation, tile size and material, vanity customization, waterproofing and fixture quality. In older homes, problems hidden behind the existing finishes may need fixing first.

In Toronto, a one-storey addition can start at about $300,000. Costs average around $200 per square foot and can pass $350 per square foot for more involved work. Labour, quality materials and professional design fees are the largest costs, and the addition’s size and complexity decide where it lands in that range. Nuance Design Build offers a free consultation and cost estimate, and builds the addition on a single contract, from the first idea to the occupancy permit.

Construction on a basement renovation in Richmond Hill, Markham, Vaughan or Toronto typically takes 6 to 10 weeks. The whole process, design and permits included, usually runs 2 to 4 months. Small cosmetic updates can finish sooner. Legal basements, secondary suites and jobs with plumbing or structural work can push construction closer to 10 to 12 weeks. Careful planning and a properly prepared permit application are what keep the schedule predictable once work begins.

Every Nuance Design Build project has a dedicated project manager who is your single point of contact. They coordinate the trades, run the schedule, oversee quality and keep you informed through demolition, rough-in, installation, finishing and the final walkthrough. You get a detailed construction schedule, updates before you have to ask, budget tracking and quality-control inspections, so you never have to chase different people for answers.

It depends on the scope and the municipality. Structural changes, additions and legal basement suites need a building permit, and the application itself can depend on where the home is. Nuance Design Build prepares the drawings and paperwork, works through the by-laws and zoning rules with the city and stays on it until the permit is approved. During construction we schedule and manage every required inspection.

Not every basement qualifies as it stands. Before anything is designed, Nuance Design Build runs a feasibility assessment of the ceiling height, the foundation and structure, existing plumbing and electrical capacity, the HVAC system, zoning eligibility and where a separate entrance could go. Some basements need larger windows or mechanical upgrades to comply. You get an honest answer at this stage, before you commit to design or permit drawings.

Yes. Nuance Design Build is fully licensed and insured. We carry WSIB coverage and $5 million in commercial liability insurance, which protects your home and investment for the whole renovation. Every project is professionally managed, with clear scheduling, daily coordination and supervision from demolition to final detailing, so workmanship, safety and cleanliness stay consistent at every stage.

Warranty terms are written into your contract. They keep our workmanship warranty, which covers how the work was built, separate from the manufacturers’ own warranties on products, fixtures and appliances. Every renovation finishes with detailing, a post-construction quality inspection and a final walkthrough before handover. Legal basement conversions also come with clear documentation of the approved work and ongoing support once the unit is complete.

Nuance Design Build works in 20 cities across the GTA: Richmond Hill, where we are based, plus Vaughan, Markham, Thornhill, King City, Downtown Toronto, North York, Scarborough, Etobicoke, Mississauga, Oakville, Burlington, Brampton, Pickering, Ajax, Whitby, Uxbridge, Aurora, Newmarket and Stouffville. We take on kitchens, bathrooms, basements (legal basement conversions included), home additions and full home renovations, as well as condo renovations and commercial fit-outs.

Still have a question?

Ask us directly

People also ask

What homeowners searchbefore they call.

Questions people across the GTA type into a search bar before they renovate, with short answers. Search them, or open one and follow where it leads.

Custom cabinetry usually makes the biggest difference. A full-height pantry, deep drawers, integrated appliance panels, hidden waste bins, a coffee station and better corner storage all add usable space. That matters most in Toronto homes, where layouts vary widely and stock cabinets rarely fit well.

People also ask

Usually not. In many homes, more thoughtful planning does what extra space would. Working out where preparation happens, how people move around the island and how storage should work often solves what feels like a size problem.

People also ask

Quartz is the easier countertop to look after; quartzite is the pick for natural stone. Quartz is engineered, non-porous and needs no sealing. Quartzite is very hard, with natural veining, but it needs periodic sealing. Nuance installs both, plus marble and porcelain.

People also ask

For most GTA homes, yes. Finishing the basement is the most cost-effective way to add usable square footage without making the house any bigger. A legal secondary suite can also bring in monthly rent that goes toward the mortgage, and a permitted unit appeals at resale to investors, multi-generational families and buyers looking to offset carrying costs.

People also ask

Size sets the starting price. After that, the cost depends on layout changes, plumbing relocation, tile size and material, vanity customization, waterproofing requirements and fixture quality. In older Toronto homes, problems behind the existing finishes often have to be corrected first (a floor levelled, plumbing adjusted), and that adds preparation time and cost.

People also ask

Home additions in Toronto average about $200 per square foot, and more involved work can go past $350 per square foot. A one-storey addition can start at around $300,000. Most of the money goes to labour, quality materials and professional design fees, and the size and complexity of the addition decide where it falls in that range.

People also ask

Good to know

Kitchen renovation in Markham:good to know.

What is different about kitchens in Markham: who reviews the work, which rules apply and the houses we tend to find. Every by-law links its source.

Kitchen renovation permits in Markham

Markham's permit rule for kitchens turns on structure. When the wall between the kitchen and the family room carries the floor above, removing it means a new opening and a beam to take the load, and both go on drawings for the City's review. The permit has to be issued before the wall comes down, so we submit the drawings early, while you are still choosing cabinets and counters.

Source: City of Markham (opens in a new tab)

Joining a Markham kitchen to the family room

With the dividing wall gone, two rooms that were finished separately become one, and the floor shows it first. Whatever each room had now meets across the strip where the wall stood, so we either run one floor through both rooms or design a transition that looks intended. Flooring continuity is priced in the estimate, so that choice is made on paper.

Where the load goes shapes the plan as well. Markham's permit list includes adding a column as well as altering a structural wall, so if the beam that replaces the wall needs support partway along, the engineer fixes the column's position first. The island and cabinet runs are then drawn around it, with the side facing the family room finished as part of that room.

A kitchen remodel in Markham, cabinets to counters

When the layout stays, the budget goes into cabinets, counters and light. In a Markham house built from the 1970s on, that often means replacing the builder's original boxes with custom storage planned around how you cook: a full-height pantry, deep drawers, panels that hide the appliances, a pull-out for waste, a coffee station and corner units that reach the back. Cabinet materials run from Thermofoil and painted MDF to Egger panels and hardwood.

Counters are quartz, quartzite, marble or porcelain, with the edge profile, the sink and the backsplash detailed together. Under-cabinet LEDs, pot lights and pendants over the island finish the room, and the electrical is planned around the island outlets and the appliances.

Book a consultation

Plan the kitchen around your day.It starts with a visit.

We visit, take the measurements and talk through what you have in mind.

Get A Free Estimate

Track record

Years of experience
12+
Projects completed
200+

While we build

Workplace safety insurance
WSIB
Commercial liability insurance
$5M

Where we build

GTA cities, from our Richmond Hill office
20