Bathroom renovation · Markham, York Region

Bathroom renovationin Markham.

Bathroom renovation in Markham, whether a powder room or a primary ensuite like the one we reworked in Unionville, where a walk-in shower took the tub's place. One design-build team plans the layout, waterproofing and finishes with you, then builds it under a dedicated project manager.

Ensuite with an oak vanity and brass faucets under an arched brass mirror and a globe sconce bar, a tall oak linen cabinet beside it
Arched brass mirror and globe sconces above a vase of dried flowers and a brass faucet

RoomPrimary ensuite, Unionville

DetailArched mirror, globe sconces

3-piece bathrooms from
$11.9k
4-piece master baths from
$17.5k
Or less from our office
30min
Projects completed
200+

What’s included

What’s includedin a bathroom renovation.

Ensuites, main baths, powder rooms, tub-to-shower conversions and new basement bathrooms all fall under a Markham bathroom renovation. We look at the plumbing first, since any new rough-in brings in a City permit.

Remodelled bathroom with a glass shower, a walnut vanity and makeup counter, a scalloped mirror and brass sconces

Full bathroom remodeling

The plumbing and structure you have now shape the layout changes, which leave the room feeling cleaner, larger and easier to use.

  • Custom vanity installation
  • Upgraded tile layout
  • Improved lighting and storage
  • New fixtures and ventilation
Walk-in shower behind frameless glass, with sage-green tile, a recessed niche and brushed-brass fixtures

Curbless & walk-in showers

Where the old tub stood, a walk-in or curbless shower goes in, its floor sloped toward one linear drain while the tile carries on level.

  • Curbless, level entries
  • Frameless glass and recessed niches
  • Full-height tile walls
  • Linear drains and bench seating
Walnut vanity with a white quartz top, a brushed-brass faucet, a black-framed mirror and brass sconces

Finishes & fixtures

Materials that suit each other and stand up to moisture and daily use, picked for a room that still feels calm in ten years.

  • Large-format porcelain
  • Handcrafted wall tile
  • Quartz and Taj Mahal style surfaces
  • Brass fixtures, Shaker cabinetry
Mid-build: shower walls sealed in waterproofing membrane above a herringbone tile base

Waterproofing & preparation

Under the tile are the layers that set how long the bathroom lasts. We give them as much care as the tile.

  • Mapei AquaDefense or Schluter systems
  • Membrane across curbless floors
  • Substrate preparation and tile levelling
  • Precise fixture alignment

Before construction begins, we evaluate

  • Plumbing locations
  • Structural limitations
  • Lighting opportunities
  • Storage needs
  • Daily usage habits

Plan your budget

A considered space,a clearer budget.

Explore the choices behind your bathroom renovation and see a preliminary budget update as you go. A site visit and written scope are still required.

01What kind of bathroom?
02How big is your space?

Use approximate measurements, or enter the total floor area for an irregularly shaped room.

03Choose your renovation level

Reference ranges below assume a 40 sq ft full bathroom with an 8 ft ceiling, before HST and optional upgrades. Preliminary planning figures, not confirmed Nuance prices.

04Choose your service package

Design support, coordinated selections and procurement of all agreed finish materials, including tiles, vanity, toilet and faucets.

Design consultation
Full design service
Demolition
Included
Plumbing and electrical rough-in
Included within the agreed scope
Waterproofing
Included where required
Tile installation labour
Included
All agreed finish materials and fixtures
Nuance-supplied within the allowance
Project management
Included

Construction inclusions apply to the agreed renovation scope. Product selections, quantities and design deliverables are confirmed before work begins.

Both estimates include an allowance for finishes and fixtures. Semi-Package shows these as your purchases; Full-Package includes Nuance’s design service and procurement within the stated allowance.

05The details that make it yours

Each upgrade is added once. Feasibility and final specifications are confirmed during the site assessment.

How it runs

From the first measurementto the final walkthrough.

Six steps, and the same project manager runs every one of them.

First visit to handover, typically
7 to 8 weeks
  1. Step 1: Site measurement

    We take every measurement at your home after hearing what you need. 1 wk, from week 0.

  2. Step 2: Design development

    Durable materials, and buildable plans drawn from your ideas. 1 to 2 wks, from week 1.

  3. Step 3: Detailed estimating

    No hidden costs. The quote is clear and set by your budget. 1 wk, from week 2.

  4. Step 4: Permit coordination

    Some jobs need a permit. We draw up those forms with the city. Up to 2 wks, if needed, from week 3.

  5. Step 5: Construction

    You’re kept informed as your project manager lines up the trades. 3 to 5 wks, from week 3.

  6. Step 6: Final walkthrough

    We finish, touch up and clean, then walk through every detail with you. 1 wk, from week 6.

Dedicated project manager, start to finish

Timings are typical. Hatching marks where a step can run longer. Each job gets its own schedule.

Why Nuance

Why homeowners chooseNuance for bathrooms.

A bathroom has to be designed well and built well. At Nuance, one team does both.

  1. Floating grey vanity with a lit oval mirror, a black wall-mounted faucet and curved open shelves

    Dedicated project manager, clear communication

    A dedicated project manager is yours from the first visit. You’ll always know what’s under way and what’s coming.

  2. Design rendering of an ensuite: an oak vanity under an arched brass mirror, wainscoted walls and a glass shower with brass fixtures

    Custom design thinking

    Layout and materials follow your routine, and before construction the design is confirmed buildable and consistent.

  3. Wainscoted bathroom wall with a brushed-brass towel bar and paper holder beside the toilet

    Skilled installation, consistent quality control

    Our construction team does the waterproofing, substrate prep and tile levelling, with quality checks at every stage.

  4. Frameless glass shower with black fixtures and a mosaic floor beside a white vanity and a small window

    WSIB and liability insurance

    We carry WSIB and $5 million in commercial liability insurance for the whole renovation.

Client reviews

Clients, in theirown words.

Google reviews from the homeowners and business owners we have built for.

Google reviews
They did a great job renovating my bathroom and creating one in my basement. Kevin was very easy to work with and was able to accommodate all our requests. Everything looks really good!
Gilbert Lam

Google reviewBathroom renovation

Thank you for turning my bathroom into one of those magazine bathrooms. Also excellent work on remove popcorn ceiling and adding pot lights.
Miranda Guo

Google reviewBathroom renovation

Reasonable price. All work finished on time. Efficient workers. Delivered what we expected.
Ella Lee

Google reviewBathroom remodeling

Kevin and his team completed a full renovation of our ensuite bathroom, shared bathroom, and laundry room and the results are amazing! Their craftsmanship and attention to detail really show in every part of the project. …
Andy Lam

Google reviewBathrooms and laundry

Nuance Construction did an amazing job on our custom bathroom addition on the 1st floor. The team was professional, punctual, and kept everything clean throughout the project. … They completed the work on time and within budget, which was a pleasant surprise. … The final result exceeded our expectations.
Alex Cheng

Google reviewBathroom addition

Kevin and his team helped me renovate my new home, which was done incredibly well. They're nice and easy to work with, and offered many suggestions to how my home could look like when I lack ideas. They pay good attention to details to …
Yuchen Li

Google reviewHome renovation

I recently had the pleasure of working with Nuance Design Build for our new office renovation project, and I must say that my experience with them was nothing short of outstanding. From the initial consultation to the final walk-through, their professionalism, craftsmanship, and attention to detail were truly impressive.
PeakForce

Google reviewOffice renovation

Kevin and his team were instrumental to bringing my condo redesign vision to life! They were professional, knowledgeable in their trades and maintained great communication. They were a pleasure to work with and I would work with them again!
Kerry Yuan

Google reviewCondo renovation

Just wrapped up our full home renovation with Kevin's team, what an amazing experience! Kevin and his crew made everything so easy from design to finish. The quality and craftsmanship completely exceeded our expectations. Couldn’t be happier with how our home turned out!
Alex Chen

Google reviewFull home renovation

I had an exceptional experience with the Nuance team. They were professional, transparent, and incredibly detail-oriented throughout the entire project. The workmanship was of the highest quality, communication was clear and consistent, and everything was completed on time as promised. I highly recommend Nuance Design Build for anyone looking for a reliable and trustworthy partner to bring their vision to reality.
jingjing wang

Google review

Highly recommend Kevin and his team! They recently helped us finish our sunroom, and the whole process was smooth from start to finish. He’s very knowledgeable, easy to communicate with, and has a great attitude. We’re really happy with the result.
Wenting LI

Google reviewSunroom

We just finished a full home renovation with Nuance! Kevin and his team made the whole process smooth—from design ideas to picking materials. The craftsmanship and quality blew us away. My wife and I couldn’t be happier with the results!
Fan Xu

Google reviewFull home renovation

Kevin and his team are true professionals. We had a wonderful experience working with them on our home renovation. highly recommend Kevin and his team !
LKD 2009

Google reviewHome renovation

Kevin and his team are very professional, dedicated and easy to approach to. They can always provide the best advice based on my needs. I would definitely recommend them to my friends.
Yuhe Wang

Google review

Kevin and team brought our visions to life. He understands our requests and relay the message to the team efficiently. Always ready to answer our questions/ concerns :)
Stephanie Lo

Google review

I am really so much happy for the work you and your team has done there is no complaints you have great friendly people to work with keep up and wish you great success in your future Thanks 🙏
jayanti patel

Google review

01

Selected projects

From the job siteto the finished room.

There are seven recent GTA renovations here, each beside a site photo shot ahead of the work or while it was underway.

Projects
07
Communities
07

Oak shaker double vanity with scalloped brass pulls under two arched brass mirrors and globe light bars
The ensuite before: yellow walls, a long granite vanity and beige floor tile
BeforeThe original ensuite

Frameless glass fronts a walk-in shower where the tub was; the water-closet partition is gone. Egger shaker panels, capped by Taj Mahal-style quartz, form the full-height storage, double vanity and makeup desk.

Removed
Tub, water-closet wall
Finish
Green tile, brushed gold
Close view of the oak shaker drawers and their scalloped brass pulls
Shaker drawers, scallop pulls

Bright ensuite: a walnut shaker vanity and makeup area under a scalloped mirror, a glass shower with a half wall, white wall mouldings
Looking down at the shower floor mid-install: herringbone mosaic, blue tape and levelling clips
On siteShower floor going in

One basin and a makeup area share the slim-shaker vanity in walnut, and the shower pairs a marble floor with antique-brass fixtures. The tub’s gone; the bedroom entrance shifted to the outer wall, with a pocket door.

Layout
Entrance moved, pocket door
Fixtures
Antique brass
Antique-brass hand shower on white tile beside two recessed niches
Antique-brass hand shower

Charcoal kitchen with a black marble island and backsplash veined in white and gold, open shelving and cream bar stools
The same kitchen mid-job: stripped to the subfloor beneath the window and upper-cabinet wall
On siteDown to the subfloor

Charcoal cabinetry runs floor to ceiling around a black marble island and a matching backsplash, the white-and-gold veining carried across every face. Open shelving and cream stools keep the dark room from feeling heavy.

Island
Wrapped in black marble
Cabinetry
Charcoal, floor to ceiling
The black marble backsplash behind a stainless range top, under charcoal fluted and slab cabinets
Marble backsplash, range wall

A long waterfall island in walnut and white quartz running toward the dining area, a crystal chandelier above
The pantry wall before the work: two freestanding cabinets on the dark floor that stayed
BeforeThe pantry wall, before

The home kept its dark floors; warm white cabinetry and walnut tones suit them. The island is a double waterfall. A large pocket door opens to custom pantry cabinetry that frames a bay for the robot vacuum and open display shelves. It reaches the living area.

Island
Waterfall edges, both ends
Pantry
Pocket door, robot-vacuum bay
Pantry cabinetry in warm white with lit open display shelving at its centre, beside the dining table
Pantry, open display shelving

Open-plan second floor: walnut lower cabinets and a bronze range hood run toward a bay window, wide-plank oak floor in afternoon light
The floor stripped mid-demolition, ceiling opened and the old stair exposed
On siteMid-demolition

Above the first floor, where the client’s parents live, we rebuilt two storeys. We took the laundry out of the kitchen, enlarged the third-floor terrace to take a new bathroom and reworked load-bearing structure to open up the plan.

Structure
Load-bearing walls modified
Added
Third-floor bathroom
Bathroom with a floating oak vanity, a backlit mirror shelf and wall-mounted brass taps, glass shower behind
Oak vanity, lit mirror shelf

Basement lounge framed by a plaster arch: a navy shaker wet bar with a brass tap, open shelving, a cream bouclé armchair and display niches
The basement before the work: open joists overhead and insulation wrapped on the walls
BeforeOpen joists, bare walls

The owners gave the design free rein. Their basement became a lounge with a custom wet bar and a powder room, plus a nook built into the wall for the household’s cat.

Added
Wet bar, powder room
For the cat
A built-in nook
Powder room with a pill-shaped mirror between two disc sconces on a navy wall, over a cream vanity with brass pulls
Powder room, navy and brass

The finished addition: red brick and grey siding over a charcoal glass-panel garage door
The addition from above during framing, crew on the upper level
On siteFraming, from above

Three full storeys now stand where the old garage was. It was demolished, a new basement dug underneath and two levels built above. The garage was relocated to the front.

Added
About 1,200 sq ft
Levels
Basement plus two
Oak stair with a frameless glass railing inside the addition
Oak stair, glass railing
See every project

Where we work

Based in Richmond Hill.Building across the GTA.

Kitchens, bathrooms, basements, additions and whole-home renovations in York Region, Toronto, Peel, Halton and Durham. The rings show roughly how long the drive is from our office, outside rush hour.

Our office
Town we serve
Completed project
Drive time, off‑peak

Towns we serve

4 regions

Not on the list?

Once we know where the house is, we can tell you. Our projects take us around the Greater Toronto Area.

Get A Free Estimate

Questions & answers

Bathroom renovation FAQsfor Markham.

Short answers on bathroom renovation in Markham. The Markham tab covers permits, local rules and the houses themselves, and the other tabs cover cost, timing and insurance.

The layout moves it most. Many Markham bathrooms are the originals in subdivision houses built from the mid-1970s on, and keeping their fixtures where they are costs less than moving the toilet or swapping the tub for a curbless shower on a new drain. After that, tile, the vanity, the fixtures and the waterproofing system set the price, and an older floor may need correcting before tile goes down.

A typical bathroom runs 7 to 8 weeks from the first visit to handover, with 3 to 5 of those weeks on site. A Markham bathroom that adds plumbing, such as a toilet moved to another wall or a first bathroom in the basement, also needs a City permit and an inspection of the new piping, so the permit review is built into the schedule before demolition.

Yes, when the plumbing changes. Markham requires a building permit to rough in a bathroom or washroom and to install any new plumbing piping. A like-for-like swap of the vanity, toilet or tub on the existing connections is not on that list, which is why we decide early whether any fixture moves.

Yes, a primary ensuite in a Unionville house, finished in spring 2026. The case study on our projects page lists the scope and materials, from the water-closet wall we took out to the custom double vanity, and has photos of the finished room.

Your project manager, working from the approved drawings. Plumbing gets the closest watch on a Markham job, because the City counts any new plumbing piping as permit work, not only a new bathroom. If a change comes up once the walls are open, such as a shower valve set higher or a hand shower added, the project manager checks whether it means piping the permit drawings don't show before the plumber goes ahead, and the City inspects the new piping before it is covered. The same person checks the tile, glass and vanity at each stage and is the one you call.

Usually a custom vanity, a new tile layout, better lighting and storage, new plumbing fixtures and modern ventilation. Before any of it, we look at where the plumbing runs, what the structure allows, the light, your storage needs and how you use the room each day, so the layout improves along with the finishes.

For a 4-piece master bathroom of 60 to 100 sq ft, our estimates start from $17,500 at a standard finish, run $21,000 to $27,000 at a premium finish and start from $27,000 at a luxury finish. Layout changes, moving plumbing and the condition of what is behind the old finishes all move the final price.

We favour finishes that handle moisture and daily use and still look right together: large-format porcelain, handcrafted wall tile, quartz and Taj Mahal style quartz surfaces, brass fixtures, Shaker-style cabinetry and warm wood accents. We choose them for a calm room that lasts rather than for a short-term trend.

Typically 7 to 8 weeks from the first visit to handover. Measuring, design and the quote take about the first 3 weeks, and construction 3 to 5 more. In an older home, correcting a floor or plumbing before the tile goes in can add time.

At a standard finish, a 3-piece bathroom with a tub starts from $11,900, a 3-piece with a walk-in shower from $13,500, and a 4-piece master bathroom of 60 to 100 sq ft from $17,500. Bathrooms over 100 sq ft start from $20,000. Premium and luxury finishes raise each figure. Beyond size, the price follows layout changes, plumbing relocation, tile size and material, vanity customization, waterproofing and fixture quality. In older homes, problems hidden behind the existing finishes may need fixing first.

Yes. Nuance Design Build is fully licensed and insured. We carry WSIB coverage and $5 million in commercial liability insurance, which protects your home and investment for the whole renovation. Every project is professionally managed, with clear scheduling, daily coordination and supervision from demolition to final detailing, so workmanship, safety and cleanliness stay consistent at every stage.

Warranty terms are written into your contract. They keep our workmanship warranty, which covers how the work was built, separate from the manufacturers’ own warranties on products, fixtures and appliances. Every renovation finishes with detailing, a post-construction quality inspection and a final walkthrough before handover. Legal basement conversions also come with clear documentation of the approved work and ongoing support once the unit is complete.

A straightforward kitchen update with Nuance Design Build starts around $35,000. A fully customized kitchen, with premium cabinetry, quartz, quartzite or marble counters, upgraded lighting and a new layout, often runs $45,000 to $60,000 or more. Where yours lands depends on the cabinet material (Thermofoil, painted MDF, Egger or hardwood), the countertop, any plumbing changes, flooring that runs into the next rooms, built-in appliances and the lighting design. Settling the design early keeps the budget and the build in line, so the cost stays predictable.

In Toronto, a one-storey addition can start at about $300,000. Costs average around $200 per square foot and can pass $350 per square foot for more involved work. Labour, quality materials and professional design fees are the largest costs, and the addition’s size and complexity decide where it lands in that range. Nuance Design Build offers a free consultation and cost estimate, and builds the addition on a single contract, from the first idea to the occupancy permit.

Design comes first. Nuance Design Build settles the design before construction starts and keeps design, budgeting and construction with one team, so the project can be priced accurately early on. We show you which elements add the most value (cabinetry, countertops, lighting, flooring transitions) and where extra spending won’t show. After the first consultation you get a detailed, transparent quote built around your priorities, with no hidden costs, and your project manager tracks the budget through construction.

Construction on a basement renovation in Richmond Hill, Markham, Vaughan or Toronto typically takes 6 to 10 weeks. The whole process, design and permits included, usually runs 2 to 4 months. Small cosmetic updates can finish sooner. Legal basements, secondary suites and jobs with plumbing or structural work can push construction closer to 10 to 12 weeks. Careful planning and a properly prepared permit application are what keep the schedule predictable once work begins.

Nuance Design Build visits your home. We talk about how you use the space today and what needs to change, and take the measurements needed to start the design accurately. We also look at layout options, structural limits and where the utilities run, so the project starts from a realistic direction rather than a wish list. From there we prepare a detailed, transparent quote for the full scope, worked out around your budget and priorities.

Every Nuance Design Build project has a dedicated project manager who is your single point of contact. They coordinate the trades, run the schedule, oversee quality and keep you informed through demolition, rough-in, installation, finishing and the final walkthrough. You get a detailed construction schedule, updates before you have to ask, budget tracking and quality-control inspections, so you never have to chase different people for answers.

It depends on the scope and the municipality. Structural changes, additions and legal basement suites need a building permit, and the application itself can depend on where the home is. Nuance Design Build prepares the drawings and paperwork, works through the by-laws and zoning rules with the city and stays on it until the permit is approved. During construction we schedule and manage every required inspection.

Not every basement qualifies as it stands. Before anything is designed, Nuance Design Build runs a feasibility assessment of the ceiling height, the foundation and structure, existing plumbing and electrical capacity, the HVAC system, zoning eligibility and where a separate entrance could go. Some basements need larger windows or mechanical upgrades to comply. You get an honest answer at this stage, before you commit to design or permit drawings.

Nuance Design Build works in 20 cities across the GTA: Richmond Hill, where we are based, plus Vaughan, Markham, Thornhill, King City, Downtown Toronto, North York, Scarborough, Etobicoke, Mississauga, Oakville, Burlington, Brampton, Pickering, Ajax, Whitby, Uxbridge, Aurora, Newmarket and Stouffville. We take on kitchens, bathrooms, basements (legal basement conversions included), home additions and full home renovations, as well as condo renovations and commercial fit-outs.

Still have a question?

Ask us directly

People also ask

What homeowners searchbefore they call.

Questions people across the GTA type into a search bar before they renovate, with short answers. Search them, or open one and follow where it leads.

Frameless glass, recessed niches, full-height tile walls, linear drains and bench seating are the upgrades homeowners ask for most. Together they make a walk-in shower feel open and easy to keep clean, and a curbless entry, with the floor sloped to the drain, removes the step altogether. In many Toronto homes, replacing an old tub this way changes how the bathroom works and how it looks.

People also ask

Keep the layout and plumbing where they are, and choose a standard finish. At Nuance Design Build, a 3-piece bathroom of 36 to 45 sq ft in Toronto then starts from $11,900 with a tub or $13,500 with a shower. Premium finishes run $14,000 to $22,000.

People also ask

Start with the layout rather than the tile. Looking at the plumbing, structure, lighting and storage together often turns up changes that make a small bathroom look bigger and cleaner, and a walk-in shower in place of a built-in tub opens it up further.

People also ask

For most GTA homes, yes. Finishing the basement is the most cost-effective way to add usable square footage without making the house any bigger. A legal secondary suite can also bring in monthly rent that goes toward the mortgage, and a permitted unit appeals at resale to investors, multi-generational families and buyers looking to offset carrying costs.

People also ask

Size sets the starting price. After that, the cost depends on layout changes, plumbing relocation, tile size and material, vanity customization, waterproofing requirements and fixture quality. In older Toronto homes, problems behind the existing finishes often have to be corrected first (a floor levelled, plumbing adjusted), and that adds preparation time and cost.

People also ask

Home additions in Toronto average about $200 per square foot, and more involved work can go past $350 per square foot. A one-storey addition can start at around $300,000. Most of the money goes to labour, quality materials and professional design fees, and the size and complexity of the addition decide where it falls in that range.

People also ask

Good to know

Bathroom renovation in Markham:good to know.

What is different about bathrooms in Markham: who reviews the work, which rules apply and the houses we tend to find. Every by-law links its source.

Bathroom renovation permits in Markham

The trigger in Markham is new plumbing. Roughing in a washroom or adding piping of any kind is permitted, inspected work, so a basement bathroom, a toilet moved to the other wall or a shower on a new linear drain all need a building permit. When yours does, we draw the plumbing layout, file the application with the City and keep the walls open until the inspection passes, before membrane and tile go on. A refresh that keeps the existing connections falls outside that rule, and it still gets the full waterproofing system.

Source: City of Markham (opens in a new tab)

Unionville ensuite: tub out, walk-in shower in

The Unionville ensuite started out outdated and closed in. The wall around the water closet came out to open the layout, and the original bathtub made way for a walk-in shower behind frameless glass, lined in handcrafted green tile with brushed gold fixtures. A custom double vanity, a makeup desk and full-height storage are built in Egger Shaker-style door panels under a Taj Mahal-style quartz counter. Photos of the finished room are in the case study.

Source: Unionville ensuite case study (opens in a new tab)

Bathroom remodel in Markham with one bathroom

If the bathroom being remodelled is the only one in the house, plan around the 3 to 5 weeks of construction. We settle the design, order the tile and fixtures and get any City permit before demolition, so the room is out of use only while it is being built. If you were already thinking about a basement bathroom, building it first gives the house a second one before the main bath comes apart; in Markham that is a new rough-in with its own permit.

Book a consultation

From powder room to ensuite,it starts with a visit.

We visit, take the measurements and talk through what you have in mind.

Get A Free Estimate

Track record

Years of experience
12+
Projects completed
200+

While we build

Workplace safety insurance
WSIB
Commercial liability insurance
$5M

Where we build

GTA cities, from our Richmond Hill office
20