
Increased property value
Because a home’s price follows its room count, a well-built addition gives you value along with space.
Home additions · Richmond Hill, York Region
Home additions in Richmond Hill, designed to match the style and materials of the house you have. Our design-build team, with its office in the city, carries each one from the first idea to the final occupancy permit.


RoomThree-storey addition, Uxbridge
DetailUpper storey, mid-build
What’s included
A Richmond Hill addition can build out at the rear or side, build up over the house, or add a self-contained unit for family or rent. We take each one through design, structure, the City's permits and the finishes.

On the ground floor, we add at the back or side so old and new rooms connect easily for movement, utilities and services.

As strong and long-lived as the floors under it: a second storey on your current house.

Apart from the house but on your lot, a building planned and built by the team that would extend it.

New rooms match the old in style and materials, and one firm stays responsible until the occupancy permit.
How it runs
Whatever the step, you call a dedicated project manager, and all six are under one contract.
A home visit, where we listen to what you need and measure it all. 1 wk, from week 0.
Durable materials, and buildable plans drawn from your ideas. 4 to 6 wks, from week 1.
No hidden costs. The quote is clear and set by your budget. 1 to 2 wks, from week 5.
If the job needs a permit, we prepare the paperwork with the city. 8 to 12 wks, from week 6.
Trade scheduling and updates come from your project manager. 14 to 20 wks, from week 14.
We check each detail with you after finishing, touch-ups and cleaning. 1 wk, from week 28.
Dedicated project manager, start to finish
The bars show typical timings, hatched where steps may run long. Schedules are set job by job.
Why add on
With a well-built addition, you invest in your family’s life today and the home’s future value.

Because a home’s price follows its room count, a well-built addition gives you value along with space.

Build up, build out or build new: add a storey, a room or a few rooms, or a separate building in your yard.

Done in your house’s own materials and style, with layouts that make moving around, utilities and services easy.

One local design-build firm takes the addition from first idea to occupancy permit, so messages don’t get lost between companies.
Client reviews
Google reviews from the homeowners and business owners we have built for.
Google reviewsThey did a great job renovating my bathroom and creating one in my basement. Kevin was very easy to work with and was able to accommodate all our requests. Everything looks really good!
Nuance Construction did an amazing job on our custom bathroom addition on the 1st floor. The team was professional, punctual, and kept everything clean throughout the project. … They completed the work on time and within budget, which was a pleasant surprise. … The final result exceeded our expectations.
Kevin and his team helped me renovate my new home, which was done incredibly well. They're nice and easy to work with, and offered many suggestions to how my home could look like when I lack ideas. They pay good attention to details to …
I recently had the pleasure of working with Nuance Design Build for our new office renovation project, and I must say that my experience with them was nothing short of outstanding. From the initial consultation to the final walk-through, their professionalism, craftsmanship, and attention to detail were truly impressive.
Kevin and his team were instrumental to bringing my condo redesign vision to life! They were professional, knowledgeable in their trades and maintained great communication. They were a pleasure to work with and I would work with them again!
Kevin and his team completed a full renovation of our ensuite bathroom, shared bathroom, and laundry room and the results are amazing! Their craftsmanship and attention to detail really show in every part of the project. …
Just wrapped up our full home renovation with Kevin's team, what an amazing experience! Kevin and his crew made everything so easy from design to finish. The quality and craftsmanship completely exceeded our expectations. Couldn’t be happier with how our home turned out!
Thank you for turning my bathroom into one of those magazine bathrooms. Also excellent work on remove popcorn ceiling and adding pot lights.
I had an exceptional experience with the Nuance team. They were professional, transparent, and incredibly detail-oriented throughout the entire project. The workmanship was of the highest quality, communication was clear and consistent, and everything was completed on time as promised. I highly recommend Nuance Design Build for anyone looking for a reliable and trustworthy partner to bring their vision to reality.
Highly recommend Kevin and his team! They recently helped us finish our sunroom, and the whole process was smooth from start to finish. He’s very knowledgeable, easy to communicate with, and has a great attitude. We’re really happy with the result.
We just finished a full home renovation with Nuance! Kevin and his team made the whole process smooth—from design ideas to picking materials. The craftsmanship and quality blew us away. My wife and I couldn’t be happier with the results!
Kevin and his team are true professionals. We had a wonderful experience working with them on our home renovation. highly recommend Kevin and his team !
Kevin and his team are very professional, dedicated and easy to approach to. They can always provide the best advice based on my needs. I would definitely recommend them to my friends.
Kevin and team brought our visions to life. He understands our requests and relay the message to the team efficiently. Always ready to answer our questions/ concerns :)
I am really so much happy for the work you and your team has done there is no complaints you have great friendly people to work with keep up and wish you great success in your future Thanks 🙏
Reasonable price. All work finished on time. Efficient workers. Delivered what we expected.
01
Selected projects
Each of these seven recent GTA renovations comes with a job-site photo, taken before the work or partway through it.


UxbridgeWinter 2024
The old garage came down, a new basement was excavated beneath it and two levels went up on top: a full three-storey addition, with the garage moved to the front of the lot.



Richmond Hill
An island and backsplash in black marble, veined in white and gold across every face, are framed by floor-to-ceiling charcoal cabinetry. Open shelves and cream stools mean the dark room doesn’t feel heavy.



North York2026
Warm white cabinets and walnut tones suit the home’s existing dark floors. The island has waterfall edges at both ends. Custom pantry cabinetry runs into the living area behind a large pocket door, with a robot-vacuum bay and open display shelving at its centre.



Downtown TorontoSpring 2024
The client’s parents live on the first floor, so we rebuilt the two above it. Load-bearing structure was modified for an open plan, the laundry moved out of the kitchen, and the third-floor terrace was extended to fit a new bathroom.



Brampton2025
A lounge took over the basement. The household’s cat has a nook set into a wall, and there’s a custom wet bar plus a powder room. The owners let us design it our way.



UnionvilleSpring 2026
We removed the water-closet wall and swapped the tub for a frameless-glass walk-in shower. The makeup desk, floor-to-ceiling storage and double vanity are Egger shaker panels topped with Taj Mahal-style quartz.



Thornhill2026
The tub is gone, and the bedroom entrance, now on the exterior wall, has a pocket door. In the shower, marble underfoot meets antique-brass fixtures; the walnut slim-shaker vanity puts one sink beside a makeup area.

Gallery
Finished additions, basements, ensuites and kitchens, and the steel and framing that came first.
Tap any photo to see it full size.Drag a row to scrub through it, or open any photo full size.
29photosKitchens, baths, basements & additions
Where we work
Kitchens, bathrooms, basements, additions and whole-home renovations in York Region, Toronto, Peel, Halton and Durham. The rings show roughly how long the drive is from our office, outside rush hour.
4 regions
York Region
Toronto
Peel & Halton
Durham
Not on the list?
We take on projects across the Greater Toronto Area. Tell us where the house is and we’ll let you know.
Get A Free EstimateQuestions & answers
Short answers on home additions in Richmond Hill. The Richmond Hill tab covers permits, local rules and the houses themselves, and the other tabs cover cost, timing and insurance.
We price it once the house and lot are measured and the addition is designed. In Richmond Hill, size moves the cost in two ways. A bigger footprint means more foundation, framing and roof, and an addition of about 400 square feet or more, or one that changes how water drains across the lot, also needs a site alteration permit and a grading plan beside the building permit. Structure comes next: a second storey asks more of the house underneath, so a qualified engineer reviews the framing and footings before the design is settled. Finishes set the rest.
On our usual timings, permit coordination takes 8 to 12 weeks and construction 14 to 20, after design and the estimate. If a Richmond Hill property is inside the Oak Ridges Moraine and the addition needs a site alteration permit, the City first requires an Oak Ridges Moraine pre-consultation meeting, and it may ask for a Natural Heritage Evaluation and a conformity statement as well. We check for the moraine at the first measurement, so that meeting can be arranged while the addition is still being designed.
Yes. Every addition needs a building permit from the City of Richmond Hill, and on a lot the TRCA regulates, the conservation authority's permit or clearance has to come first, because the City cannot issue the building permit without it. A larger addition can also need a site alteration permit, and a tree permit applies when the work comes close to a protected tree. We check which apply before the design is final, then prepare and file each one.
It can be, if it meets both of the City's conditions. Richmond Hill's site alteration rules exempt an addition that is generally under 400 square feet of floor area and does not affect the surface drainage of your property or the properties next to it. A small addition that sends runoff toward a neighbour's yard can still need the permit, so we look at the grades around the footprint at the first measurement. The same two tests apply to an additional residential unit.
Only when a protected tree stands close to the work. Under Richmond Hill's Tree Preservation By-law, removing or injuring any tree whose trunk measures 15 cm or more across at breast height takes a permit first, and digging footings or storing materials near one can bring an addition under that rule. An arborist's report can be part of the application. We note the trees on and beside the lot at the first visit, then plan the footprint and staging around them where the lot allows.
Three kinds. Second-storey additions build up, rear and side additions build out on the ground floor, and a separate building can go in the yard. All three are designed to match the style and materials of the house.
Yes. Our designers and architects match your home’s style and materials so old and new blend, and the new space is built to last as long as the house it joins.
Yes. In Toronto the building permit comes from Toronto Building, and the drawings must show the addition meets the zoning. We prepare the drawings and applications, deal with the city on by-laws and zoning, and carry the job to the occupancy permit.
Size and complexity set the cost, and labour, quality materials and professional design fees are usually the biggest expenses. In Toronto, additions average around $200 per square foot and can rise past $350 for more intricate work.
In Toronto, a one-storey addition can start at about $300,000. Costs average around $200 per square foot and can pass $350 per square foot for more involved work. Labour, quality materials and professional design fees are the largest costs, and the addition’s size and complexity decide where it lands in that range. Nuance Design Build offers a free consultation and cost estimate, and builds the addition on a single contract, from the first idea to the occupancy permit.
Every Nuance Design Build project has a dedicated project manager who is your single point of contact. They coordinate the trades, run the schedule, oversee quality and keep you informed through demolition, rough-in, installation, finishing and the final walkthrough. You get a detailed construction schedule, updates before you have to ask, budget tracking and quality-control inspections, so you never have to chase different people for answers.
It depends on the scope and the municipality. Structural changes, additions and legal basement suites need a building permit, and the application itself can depend on where the home is. Nuance Design Build prepares the drawings and paperwork, works through the by-laws and zoning rules with the city and stays on it until the permit is approved. During construction we schedule and manage every required inspection.
A straightforward kitchen update with Nuance Design Build starts around $35,000. A fully customized kitchen, with premium cabinetry, quartz, quartzite or marble counters, upgraded lighting and a new layout, often runs $45,000 to $60,000 or more. Where yours lands depends on the cabinet material (Thermofoil, painted MDF, Egger or hardwood), the countertop, any plumbing changes, flooring that runs into the next rooms, built-in appliances and the lighting design. Settling the design early keeps the budget and the build in line, so the cost stays predictable.
At a standard finish, a 3-piece bathroom with a tub starts from $11,900, a 3-piece with a walk-in shower from $13,500, and a 4-piece master bathroom of 60 to 100 sq ft from $17,500. Bathrooms over 100 sq ft start from $20,000. Premium and luxury finishes raise each figure. Beyond size, the price follows layout changes, plumbing relocation, tile size and material, vanity customization, waterproofing and fixture quality. In older homes, problems hidden behind the existing finishes may need fixing first.
Design comes first. Nuance Design Build settles the design before construction starts and keeps design, budgeting and construction with one team, so the project can be priced accurately early on. We show you which elements add the most value (cabinetry, countertops, lighting, flooring transitions) and where extra spending won’t show. After the first consultation you get a detailed, transparent quote built around your priorities, with no hidden costs, and your project manager tracks the budget through construction.
Construction on a basement renovation in Richmond Hill, Markham, Vaughan or Toronto typically takes 6 to 10 weeks. The whole process, design and permits included, usually runs 2 to 4 months. Small cosmetic updates can finish sooner. Legal basements, secondary suites and jobs with plumbing or structural work can push construction closer to 10 to 12 weeks. Careful planning and a properly prepared permit application are what keep the schedule predictable once work begins.
Nuance Design Build visits your home. We talk about how you use the space today and what needs to change, and take the measurements needed to start the design accurately. We also look at layout options, structural limits and where the utilities run, so the project starts from a realistic direction rather than a wish list. From there we prepare a detailed, transparent quote for the full scope, worked out around your budget and priorities.
A basement suite is legal in Ontario if it is a self-contained unit (a secondary dwelling unit) that meets the Ontario Building Code and local zoning by-laws and has passed municipal permit inspections. It usually needs a separate entrance, a full kitchen with proper ventilation, a 3- or 4-piece bathroom, bedrooms with egress windows, fire-rated separation between units, an independent or properly balanced HVAC system, soundproofing, ESA-certified electrical, and interconnected smoke and CO alarms. Without permits, it cannot legally be rented.
Not every basement qualifies as it stands. Before anything is designed, Nuance Design Build runs a feasibility assessment of the ceiling height, the foundation and structure, existing plumbing and electrical capacity, the HVAC system, zoning eligibility and where a separate entrance could go. Some basements need larger windows or mechanical upgrades to comply. You get an honest answer at this stage, before you commit to design or permit drawings.
Yes. Nuance Design Build is fully licensed and insured. We carry WSIB coverage and $5 million in commercial liability insurance, which protects your home and investment for the whole renovation. Every project is professionally managed, with clear scheduling, daily coordination and supervision from demolition to final detailing, so workmanship, safety and cleanliness stay consistent at every stage.
Warranty terms are written into your contract. They keep our workmanship warranty, which covers how the work was built, separate from the manufacturers’ own warranties on products, fixtures and appliances. Every renovation finishes with detailing, a post-construction quality inspection and a final walkthrough before handover. Legal basement conversions also come with clear documentation of the approved work and ongoing support once the unit is complete.
Nuance Design Build works in 20 cities across the GTA: Richmond Hill, where we are based, plus Vaughan, Markham, Thornhill, King City, Downtown Toronto, North York, Scarborough, Etobicoke, Mississauga, Oakville, Burlington, Brampton, Pickering, Ajax, Whitby, Uxbridge, Aurora, Newmarket and Stouffville. We take on kitchens, bathrooms, basements (legal basement conversions included), home additions and full home renovations, as well as condo renovations and commercial fit-outs.
Still have a question?
Ask us directlyPeople also ask
Questions people across the GTA type into a search bar before they renovate, with short answers. Search them, or open one and follow where it leads.
23questions
If the lot and the house can take it, yes: an addition gets you more room without moving. You can build up with a storey, build out with a room or a few, or build new in the yard, and the design matches the house you already have.
People also ask
A well-built one is. Homes are categorized for pricing by their number of rooms, so an addition adds to what the house is worth as well as to its space. Matching the original house, and building the new rooms to last as long as the old, protects that value.
People also ask
Designers and architects. At Nuance Design Build they draw the addition to match the existing house, and the same firm then prices and builds it, so the drawings, the quote and the construction all come from one place.
People also ask
For most GTA homes, yes. Finishing the basement is the most cost-effective way to add usable square footage without making the house any bigger. A legal secondary suite can also bring in monthly rent that goes toward the mortgage, and a permitted unit appeals at resale to investors, multi-generational families and buyers looking to offset carrying costs.
People also ask
Size sets the starting price. After that, the cost depends on layout changes, plumbing relocation, tile size and material, vanity customization, waterproofing requirements and fixture quality. In older Toronto homes, problems behind the existing finishes often have to be corrected first (a floor levelled, plumbing adjusted), and that adds preparation time and cost.
People also ask
Home additions in Toronto average about $200 per square foot, and more involved work can go past $350 per square foot. A one-storey addition can start at around $300,000. Most of the money goes to labour, quality materials and professional design fees, and the size and complexity of the addition decide where it falls in that range.
People also ask
Good to know
What is different about additions in Richmond Hill: who reviews the work, which rules apply and the houses we tend to find. Every by-law links its source.
On a lot inside a TRCA Regulated Area, the order of approvals is set for you. The conservation authority reviews the addition first, and the City cannot legally issue the building permit until the TRCA permit or a clearance has been obtained. So we check the lot against the regulated area at the first measurement and, once the footprint is fixed, prepare the TRCA application while the building permit drawings are finished.
Each of those applications stays with the people who designed the addition. You sign a single contract, and our team measures, designs, prices, files and builds the addition, staying answerable until the last occupancy permit. Our designers and architects lay out the new rooms in the style and materials of the house, and where the structure changes, a qualified engineer works on the drawings with them, so the set the City reviews is the set we build from.
Source: Toronto and Region Conservation Authority (opens in a new tab)Under By-law 143-24, a Richmond Hill lot can hold up to three additional residential units on top of the main house, as long as the lot has no more than four dwellings in total, and a separate accessory building in the yard can contain two of those units at most. So we start from what the lot already has. With a basement apartment in place, there is room under the cap for two more units, in a rear addition, a second storey or a building out back, each held to the City's development standards.
Source: City of Richmond Hill (opens in a new tab)Book a consultation
We visit, take the measurements and talk through what you have in mind.
Get A Free Estimate
Track record
While we build
Where we build