
Increased property value
A well-built addition brings space and value, since homes are priced by how many rooms they have.
Home additions · Newmarket, York Region
Home additions in Newmarket: a second floor on a bungalow, or new rooms at the rear or side, designed around the house and the street it sits on. One design-build team handles the design, permits and build, on a single contract up to the occupancy permit.


RoomThree-storey addition, Uxbridge
DetailUpper storey, mid-build
What’s included
For a Newmarket addition we draw the new rooms with the house and its street in view: the foundation or the existing walls that will carry them, the roofline they join, and the heights of the houses on either side.

Rear and side additions on the ground floor, laid out for easy movement, utilities and services between old rooms and new.

Your house gains a second storey that’s as strong and durable as the floors it sits on.

We design and build a stand-alone structure on your lot with the team we’d use to extend the house.

One firm is accountable until the occupancy permit, and new rooms take the style and materials of the old.
How it runs
Six steps under one contract, with a dedicated project manager as your single point of contact.
We take every measurement at your home after hearing what you need. 1 wk, from week 0.
Plans we can build from your ideas, with durable materials. 4 to 6 wks, from week 1.
We base a clear quote on your budget and show every cost. 1 to 2 wks, from week 5.
If the job needs a permit, we prepare the paperwork with the city. 8 to 12 wks, from week 6.
Trades are booked by your project manager, who keeps you posted. 14 to 20 wks, from week 14.
We finish, touch up and clean, then walk through every detail with you. 1 wk, from week 28.
Dedicated project manager, start to finish
Steps can run into the hatching. The times shown are typical, and no two jobs share a schedule.
Why add on
With a well-built addition, you invest in your family’s life today and the home’s future value.

A well-built addition brings space and value, since homes are priced by how many rooms they have.

Go up with a storey, out with one room or several, or build new with a stand-alone building in your yard.

Layouts planned for easy movement, utilities and services, in the style and materials of the house you already have.

One local design-build firm takes the addition from first idea to occupancy permit, so messages don’t get lost between companies.
Client reviews
Google reviews from the homeowners and business owners we have built for.
Google reviewsThey did a great job renovating my bathroom and creating one in my basement. Kevin was very easy to work with and was able to accommodate all our requests. Everything looks really good!
Nuance Construction did an amazing job on our custom bathroom addition on the 1st floor. The team was professional, punctual, and kept everything clean throughout the project. … They completed the work on time and within budget, which was a pleasant surprise. … The final result exceeded our expectations.
Kevin and his team helped me renovate my new home, which was done incredibly well. They're nice and easy to work with, and offered many suggestions to how my home could look like when I lack ideas. They pay good attention to details to …
I recently had the pleasure of working with Nuance Design Build for our new office renovation project, and I must say that my experience with them was nothing short of outstanding. From the initial consultation to the final walk-through, their professionalism, craftsmanship, and attention to detail were truly impressive.
Kevin and his team were instrumental to bringing my condo redesign vision to life! They were professional, knowledgeable in their trades and maintained great communication. They were a pleasure to work with and I would work with them again!
Kevin and his team completed a full renovation of our ensuite bathroom, shared bathroom, and laundry room and the results are amazing! Their craftsmanship and attention to detail really show in every part of the project. …
Just wrapped up our full home renovation with Kevin's team, what an amazing experience! Kevin and his crew made everything so easy from design to finish. The quality and craftsmanship completely exceeded our expectations. Couldn’t be happier with how our home turned out!
Thank you for turning my bathroom into one of those magazine bathrooms. Also excellent work on remove popcorn ceiling and adding pot lights.
I had an exceptional experience with the Nuance team. They were professional, transparent, and incredibly detail-oriented throughout the entire project. The workmanship was of the highest quality, communication was clear and consistent, and everything was completed on time as promised. I highly recommend Nuance Design Build for anyone looking for a reliable and trustworthy partner to bring their vision to reality.
Highly recommend Kevin and his team! They recently helped us finish our sunroom, and the whole process was smooth from start to finish. He’s very knowledgeable, easy to communicate with, and has a great attitude. We’re really happy with the result.
We just finished a full home renovation with Nuance! Kevin and his team made the whole process smooth—from design ideas to picking materials. The craftsmanship and quality blew us away. My wife and I couldn’t be happier with the results!
Kevin and his team are true professionals. We had a wonderful experience working with them on our home renovation. highly recommend Kevin and his team !
Kevin and his team are very professional, dedicated and easy to approach to. They can always provide the best advice based on my needs. I would definitely recommend them to my friends.
Kevin and team brought our visions to life. He understands our requests and relay the message to the team efficiently. Always ready to answer our questions/ concerns :)
I am really so much happy for the work you and your team has done there is no complaints you have great friendly people to work with keep up and wish you great success in your future Thanks 🙏
Reasonable price. All work finished on time. Efficient workers. Delivered what we expected.
01
Selected projects
There are seven recent GTA renovations here, each beside a site photo shot ahead of the work or while it was underway.


UxbridgeWinter 2024
The old garage came down, a new basement was excavated beneath it and two levels went up on top: a full three-storey addition, with the garage moved to the front of the lot.



Richmond Hill
Full-height charcoal cabinets surround the island and matching backsplash, both in black marble whose white-and-gold veins wrap every face. The room is dark, but cream stools and the open shelves stop it feeling heavy.



North York2026
Warm white cabinets and walnut tones suit the home’s existing dark floors. The island has waterfall edges at both ends. Custom pantry cabinetry runs into the living area behind a large pocket door, with a robot-vacuum bay and open display shelving at its centre.



Downtown TorontoSpring 2024
The first floor is home to the client’s parents, so the two floors above it were rebuilt. Altering load-bearing structure opened the plan, the third-floor terrace grew to hold a new bathroom, and the laundry came out of the kitchen.



Brampton2025
Now a lounge, the basement holds a custom wet bar, a powder room and a wall nook for the household’s cat. The owners left the design entirely up to us.



UnionvilleSpring 2026
We removed the water-closet wall and swapped the tub for a frameless-glass walk-in shower. The makeup desk, floor-to-ceiling storage and double vanity are Egger shaker panels topped with Taj Mahal-style quartz.



Thornhill2026
One basin and a makeup area share the slim-shaker vanity in walnut, and the shower pairs a marble floor with antique-brass fixtures. The tub’s gone; the bedroom entrance shifted to the outer wall, with a pocket door.

Gallery
Kitchens and ensuites, additions and basements, plus the steel and framing put in before finish work.
Tap any photo to see it full size.Drag a row to scrub through it, or open any photo full size.
29photosKitchens, baths, basements & additions
Where we work
Kitchens, bathrooms, basements, additions and whole-home renovations in York Region, Toronto, Peel, Halton and Durham. The rings show roughly how long the drive is from our office, outside rush hour.
4 regions
York Region
Toronto
Peel & Halton
Durham
Not on the list?
We take on projects across the Greater Toronto Area. Tell us where the house is and we’ll let you know.
Get A Free EstimateQuestions & answers
Short answers on home additions in Newmarket. The Newmarket tab covers permits, local rules and the houses themselves, and the other tabs cover cost, timing and insurance.
It depends on what the drawings show, and in Newmarket those drawings answer to the street as well as the zoning. The Official Plan asks new building in a Residential Character Area to respect the area’s predominant physical characteristics and to be compatible with the existing neighbourhood, so an addition’s height and placement are weighed against the houses around it, not only the zoning maximum. A second storey also has to be carried by the walls and foundation beneath it, and any reinforcement they need goes into the quote.
Construction is the longest stage at 14 to 20 weeks, and permit coordination, usually 8 to 12 weeks, is the longest wait before it. Design development takes 4 to 6 weeks after about a week of measuring, the detailed estimate 1 to 2 more, and the final walkthrough comes last. In Newmarket the permit stage can gain approvals: a tree removal permit if the footprint takes out a large tree, or LSRCA permission on a lot near water. A lot in the Oak Ridges Moraine area adds a step at the very start, since the Town’s zoning page refers those properties to the Planning Department for their zoning.
Yes. Any addition to an existing home in Newmarket needs a building permit from the Town, whether it is one rear room or a full second storey. Trees can add another: taking down a private tree whose trunk is more than 20 cm in diameter, measured 1.4 m up, needs the Town’s removal permit before the work starts. We prepare both in the permit stage.
Yes, if the Lake Simcoe Region Conservation Authority grants permission. On a lot it regulates near a river, stream, wetland or steep slope, its rule covers any increase in a building’s size, so a second storey needs LSRCA’s permission as much as a rear addition does. Going up does change what the work disturbs: the new walls sit on the existing house, and no foundation is dug toward the bank or the slope. On a regulated Newmarket lot we draw both options before choosing a footprint.
Sometimes, though the front is where the street sets the tightest limit. On the streets built between the 1940s and the 1990s, which the Official Plan calls the Traditional Suburban Character Area, houses keep consistent setbacks, so a front addition steps out of a line its neighbours hold. We look at the rear, the side and a storey above first. If the front has to change, as with a new entry, we keep it shallow and in the house’s own materials, so the house still sits in line with its street.
Three kinds. Second-storey additions build up, rear and side additions build out on the ground floor, and a separate building can go in the yard. All three are designed to match the style and materials of the house.
Yes. Our designers and architects match your home’s style and materials so old and new blend, and the new space is built to last as long as the house it joins.
Yes. In Toronto the building permit comes from Toronto Building, and the drawings must show the addition meets the zoning. We prepare the drawings and applications, deal with the city on by-laws and zoning, and carry the job to the occupancy permit.
Size and complexity set the cost, and labour, quality materials and professional design fees are usually the biggest expenses. In Toronto, additions average around $200 per square foot and can rise past $350 for more intricate work.
In Toronto, a one-storey addition can start at about $300,000. Costs average around $200 per square foot and can pass $350 per square foot for more involved work. Labour, quality materials and professional design fees are the largest costs, and the addition’s size and complexity decide where it lands in that range. Nuance Design Build offers a free consultation and cost estimate, and builds the addition on a single contract, from the first idea to the occupancy permit.
Every Nuance Design Build project has a dedicated project manager who is your single point of contact. They coordinate the trades, run the schedule, oversee quality and keep you informed through demolition, rough-in, installation, finishing and the final walkthrough. You get a detailed construction schedule, updates before you have to ask, budget tracking and quality-control inspections, so you never have to chase different people for answers.
It depends on the scope and the municipality. Structural changes, additions and legal basement suites need a building permit, and the application itself can depend on where the home is. Nuance Design Build prepares the drawings and paperwork, works through the by-laws and zoning rules with the city and stays on it until the permit is approved. During construction we schedule and manage every required inspection.
A straightforward kitchen update with Nuance Design Build starts around $35,000. A fully customized kitchen, with premium cabinetry, quartz, quartzite or marble counters, upgraded lighting and a new layout, often runs $45,000 to $60,000 or more. Where yours lands depends on the cabinet material (Thermofoil, painted MDF, Egger or hardwood), the countertop, any plumbing changes, flooring that runs into the next rooms, built-in appliances and the lighting design. Settling the design early keeps the budget and the build in line, so the cost stays predictable.
At a standard finish, a 3-piece bathroom with a tub starts from $11,900, a 3-piece with a walk-in shower from $13,500, and a 4-piece master bathroom of 60 to 100 sq ft from $17,500. Bathrooms over 100 sq ft start from $20,000. Premium and luxury finishes raise each figure. Beyond size, the price follows layout changes, plumbing relocation, tile size and material, vanity customization, waterproofing and fixture quality. In older homes, problems hidden behind the existing finishes may need fixing first.
Design comes first. Nuance Design Build settles the design before construction starts and keeps design, budgeting and construction with one team, so the project can be priced accurately early on. We show you which elements add the most value (cabinetry, countertops, lighting, flooring transitions) and where extra spending won’t show. After the first consultation you get a detailed, transparent quote built around your priorities, with no hidden costs, and your project manager tracks the budget through construction.
Construction on a basement renovation in Richmond Hill, Markham, Vaughan or Toronto typically takes 6 to 10 weeks. The whole process, design and permits included, usually runs 2 to 4 months. Small cosmetic updates can finish sooner. Legal basements, secondary suites and jobs with plumbing or structural work can push construction closer to 10 to 12 weeks. Careful planning and a properly prepared permit application are what keep the schedule predictable once work begins.
Nuance Design Build visits your home. We talk about how you use the space today and what needs to change, and take the measurements needed to start the design accurately. We also look at layout options, structural limits and where the utilities run, so the project starts from a realistic direction rather than a wish list. From there we prepare a detailed, transparent quote for the full scope, worked out around your budget and priorities.
A basement suite is legal in Ontario if it is a self-contained unit (a secondary dwelling unit) that meets the Ontario Building Code and local zoning by-laws and has passed municipal permit inspections. It usually needs a separate entrance, a full kitchen with proper ventilation, a 3- or 4-piece bathroom, bedrooms with egress windows, fire-rated separation between units, an independent or properly balanced HVAC system, soundproofing, ESA-certified electrical, and interconnected smoke and CO alarms. Without permits, it cannot legally be rented.
Not every basement qualifies as it stands. Before anything is designed, Nuance Design Build runs a feasibility assessment of the ceiling height, the foundation and structure, existing plumbing and electrical capacity, the HVAC system, zoning eligibility and where a separate entrance could go. Some basements need larger windows or mechanical upgrades to comply. You get an honest answer at this stage, before you commit to design or permit drawings.
Yes. Nuance Design Build is fully licensed and insured. We carry WSIB coverage and $5 million in commercial liability insurance, which protects your home and investment for the whole renovation. Every project is professionally managed, with clear scheduling, daily coordination and supervision from demolition to final detailing, so workmanship, safety and cleanliness stay consistent at every stage.
Warranty terms are written into your contract. They keep our workmanship warranty, which covers how the work was built, separate from the manufacturers’ own warranties on products, fixtures and appliances. Every renovation finishes with detailing, a post-construction quality inspection and a final walkthrough before handover. Legal basement conversions also come with clear documentation of the approved work and ongoing support once the unit is complete.
Nuance Design Build works in 20 cities across the GTA: Richmond Hill, where we are based, plus Vaughan, Markham, Thornhill, King City, Downtown Toronto, North York, Scarborough, Etobicoke, Mississauga, Oakville, Burlington, Brampton, Pickering, Ajax, Whitby, Uxbridge, Aurora, Newmarket and Stouffville. We take on kitchens, bathrooms, basements (legal basement conversions included), home additions and full home renovations, as well as condo renovations and commercial fit-outs.
Still have a question?
Ask us directlyPeople also ask
Questions people across the GTA type into a search bar before they renovate, with short answers. Search them, or open one and follow where it leads.
23questions
If the lot and the house can take it, yes: an addition gets you more room without moving. You can build up with a storey, build out with a room or a few, or build new in the yard, and the design matches the house you already have.
People also ask
A well-built one is. Homes are categorized for pricing by their number of rooms, so an addition adds to what the house is worth as well as to its space. Matching the original house, and building the new rooms to last as long as the old, protects that value.
People also ask
Designers and architects. At Nuance Design Build they draw the addition to match the existing house, and the same firm then prices and builds it, so the drawings, the quote and the construction all come from one place.
People also ask
For most GTA homes, yes. Finishing the basement is the most cost-effective way to add usable square footage without making the house any bigger. A legal secondary suite can also bring in monthly rent that goes toward the mortgage, and a permitted unit appeals at resale to investors, multi-generational families and buyers looking to offset carrying costs.
People also ask
Size sets the starting price. After that, the cost depends on layout changes, plumbing relocation, tile size and material, vanity customization, waterproofing requirements and fixture quality. In older Toronto homes, problems behind the existing finishes often have to be corrected first (a floor levelled, plumbing adjusted), and that adds preparation time and cost.
People also ask
Home additions in Toronto average about $200 per square foot, and more involved work can go past $350 per square foot. A one-storey addition can start at around $300,000. Most of the money goes to labour, quality materials and professional design fees, and the size and complexity of the addition decide where it falls in that range.
People also ask
Good to know
What is different about additions in Newmarket: who reviews the work, which rules apply and the houses we tend to find. Every by-law links its source.
An addition takes ground from the yard, so beside the Town’s building permit, Newmarket’s tree rule matters. Removing a private tree above the Town’s size limit needs a permit, and the Town can also ask for an arborist’s report and replacement planting. So before sketching where the addition goes, we mark every tree near it on the measured plan, since keeping one can change the footprint.
Source: Town of Newmarket (opens in a new tab)Newmarket’s Official Plan describes the houses of its Traditional Suburban Character Area, built between the 1940s and the 1990s, as 1 to 2 storeys. A second floor on a bungalow there stays within the heights the Plan describes, and we draw it to sit with the houses beside it, its roofline and materials taken from the house and its neighbours. An engineer first confirms the walls and foundation can carry the new floor. Inside the Lower Main Street South heritage conservation district, the change also needs a heritage permit.
Book a consultation
We visit, take the measurements and talk through what you have in mind.
Get A Free Estimate
Track record
While we build
Where we build