
Dedicated project manager, clear communication
You have a dedicated project manager from the first visit, so you always know what is happening and what comes next.
Bathroom renovation · Burlington, Halton Region
Bathroom renovation in Burlington, from powder rooms to primary ensuites, with the vanity, shower, tile and lighting chosen during design and a dedicated project manager running the job from the first visit to the final clean-up.


RoomPrimary ensuite, Unionville
DetailArched mirror, globe sconces
What’s included
We renovate ensuites, main bathrooms, small bathrooms and powder rooms across Burlington, plus condo bathrooms as part of our condo renovations. Each gets the same plan: fixture layout, storage, tile, lighting, ventilation and the waterproofing behind it all.

Layout changes that make the room feel larger, cleaner and easier to use, planned around the plumbing and structure already in place.

Where the old tub stood, a walk-in or curbless shower goes in, its floor sloped toward one linear drain while the tile carries on level.

Each material is chosen to suit the rest and handle moisture and daily use. In ten years, the room should still feel calm.

How long a bathroom lasts depends on what’s under the tile, so we treat those layers as carefully as the tile.
Plan your budget
Explore the choices behind your bathroom renovation and see a preliminary budget update as you go. A site visit and written scope are still required.
How it runs
Each of the six steps has the same project manager in charge.
We meet at your home, hear what you need and take every measurement. 1 wk, from week 0.
Plans we can build from your ideas, with durable materials. 1 to 2 wks, from week 1.
No hidden costs. The quote is clear and set by your budget. 1 wk, from week 2.
We do the permit paperwork with the city, if your job needs one. Up to 2 wks, if needed, from week 3.
Your project manager schedules the trades and keeps you informed. 3 to 5 wks, from week 3.
We finish, touch up and clean, then walk through every detail with you. 1 wk, from week 6.
Dedicated project manager, start to finish
Timings are typical. Hatching marks where a step can run longer. Each job gets its own schedule.
Why Nuance
A bathroom’s design and build must both be right. Nuance has one team for them.

You have a dedicated project manager from the first visit, so you always know what is happening and what comes next.

Layout and materials follow your routine, and before construction the design is confirmed buildable and consistent.

Each stage is checked for quality. Our construction team handles substrate prep, waterproofing and tile levelling.

We’re insured for the full renovation: WSIB, plus $5 million of commercial liability.
Client reviews
Google reviews from the homeowners and business owners we have built for.
Google reviewsThey did a great job renovating my bathroom and creating one in my basement. Kevin was very easy to work with and was able to accommodate all our requests. Everything looks really good!
Thank you for turning my bathroom into one of those magazine bathrooms. Also excellent work on remove popcorn ceiling and adding pot lights.
Reasonable price. All work finished on time. Efficient workers. Delivered what we expected.
Kevin and his team completed a full renovation of our ensuite bathroom, shared bathroom, and laundry room and the results are amazing! Their craftsmanship and attention to detail really show in every part of the project. …
Nuance Construction did an amazing job on our custom bathroom addition on the 1st floor. The team was professional, punctual, and kept everything clean throughout the project. … They completed the work on time and within budget, which was a pleasant surprise. … The final result exceeded our expectations.
Kevin and his team helped me renovate my new home, which was done incredibly well. They're nice and easy to work with, and offered many suggestions to how my home could look like when I lack ideas. They pay good attention to details to …
I recently had the pleasure of working with Nuance Design Build for our new office renovation project, and I must say that my experience with them was nothing short of outstanding. From the initial consultation to the final walk-through, their professionalism, craftsmanship, and attention to detail were truly impressive.
Kevin and his team were instrumental to bringing my condo redesign vision to life! They were professional, knowledgeable in their trades and maintained great communication. They were a pleasure to work with and I would work with them again!
Just wrapped up our full home renovation with Kevin's team, what an amazing experience! Kevin and his crew made everything so easy from design to finish. The quality and craftsmanship completely exceeded our expectations. Couldn’t be happier with how our home turned out!
I had an exceptional experience with the Nuance team. They were professional, transparent, and incredibly detail-oriented throughout the entire project. The workmanship was of the highest quality, communication was clear and consistent, and everything was completed on time as promised. I highly recommend Nuance Design Build for anyone looking for a reliable and trustworthy partner to bring their vision to reality.
Highly recommend Kevin and his team! They recently helped us finish our sunroom, and the whole process was smooth from start to finish. He’s very knowledgeable, easy to communicate with, and has a great attitude. We’re really happy with the result.
We just finished a full home renovation with Nuance! Kevin and his team made the whole process smooth—from design ideas to picking materials. The craftsmanship and quality blew us away. My wife and I couldn’t be happier with the results!
Kevin and his team are true professionals. We had a wonderful experience working with them on our home renovation. highly recommend Kevin and his team !
Kevin and his team are very professional, dedicated and easy to approach to. They can always provide the best advice based on my needs. I would definitely recommend them to my friends.
Kevin and team brought our visions to life. He understands our requests and relay the message to the team efficiently. Always ready to answer our questions/ concerns :)
I am really so much happy for the work you and your team has done there is no complaints you have great friendly people to work with keep up and wish you great success in your future Thanks 🙏
01
Selected projects
These are seven recent renovations in the GTA. Each one has an on-site photo from before work started or mid-job.


UnionvilleSpring 2026
The tub is now a walk-in shower with frameless glass, and the toilet is no longer walled in. Taj Mahal-style quartz tops Egger shaker panels on the double vanity, the makeup desk and the full-height storage.



Thornhill2026
The tub came out, and the bedroom entrance moved to the exterior wall behind a pocket door. A walnut slim-shaker vanity pairs one sink with a makeup area; the shower sets a marble floor against antique-brass fixtures.



Richmond Hill
Charcoal cabinetry runs floor to ceiling around a black marble island and a matching backsplash, the white-and-gold veining carried across every face. Open shelving and cream stools keep the dark room from feeling heavy.



North York2026
Walnut tones and warm white cabinets work with the dark floors that stayed. Both ends of the island finish in waterfall edges. Behind a big pocket door, custom pantry cabinetry extends into the living area, centred on open display shelves and a robot-vacuum bay.



Downtown TorontoSpring 2024
We rebuilt the second and third floors, as the client’s parents occupy the first. An open plan meant changing load-bearing structure. The laundry left the kitchen, and extending the third-floor terrace made space for a new bathroom.



Brampton2025
A lounge took over the basement. The household’s cat has a nook set into a wall, and there’s a custom wet bar plus a powder room. The owners let us design it our way.



UxbridgeWinter 2024
With the old garage gone, we excavated a new basement there and raised two levels over it. The garage itself moved to the front, and the addition rises three full storeys.

Gallery
Framing and steel go up before any finish. Here they join kitchens, basements, ensuites and additions.
Tap any photo to see it full size.Drag a row to scrub through it, or open any photo full size.
29photosKitchens, baths, basements & additions
Where we work
Kitchens, bathrooms, basements, additions and whole-home renovations in York Region, Toronto, Peel, Halton and Durham. The rings show roughly how long the drive is from our office, outside rush hour.
4 regions
York Region
Toronto
Peel & Halton
Durham
Not on the list?
Give us the location of the house and you’ll hear back. We build all over the Greater Toronto Area.
Get A Free EstimateQuestions & answers
Short answers on bathroom renovation in Burlington. The Burlington tab covers permits, local rules and the houses themselves, and the other tabs cover cost, timing and insurance.
Two things move it most here: whether the layout changes, and what is behind the walls. Many Burlington houses date from the population boom after the Second World War, and a bathroom from then can still have its first plumbing and wiring, which we replace once the room is opened. Moving a toilet or shower means new drain work and can bring a permit. Size, tile, vanity and fixtures set the rest, priced in detail after design.
Seven to eight weeks is usual, counted from our first visit until the room is handed back. The crew is on site for 3 to 5 of them; the earlier weeks go to measuring, design and the detailed quote. Where a Burlington bathroom lands in that range depends mostly on the layout: keep every fixture where it is and construction can follow the quote, while a moved drain waits for the City's permit, which we file as soon as the layout is fixed.
You may, if the plumbing or framing changes. A drain moved, a new bathroom where there was none or altered framing can each bring the City of Burlington's building permit into the job, and when it does we prepare the drawings, file them and book the inspections. A remodel that keeps every fixture where it is avoids that plumbing work, and we confirm which case yours is at the first visit.
Yes. The lights, the exhaust fan and any new outlets are placed during design, along with the vanity and shower, and the electrician works under your project manager like every other trade, so there is no one extra for you to hire. New wiring is reported to the Electrical Safety Authority, separately from any City permit, and inspected under that notification. The fan is sized and ducted so the room clears its steam after a shower.
It depends on the floor area. We group bathrooms by size the way we price them: a three-piece room of 36 to 45 square feet holds a tub or a shower, and a four-piece room with both is 60 to 100 square feet. In the smaller room the choice is a walk-in shower where the tub stood or a tub kept under full-height tile. A freestanding soaking tub also needs clear floor on every side and a drain where it stands, so it is drawn with the plumbing before anything is ordered.
Usually a custom vanity, a new tile layout, better lighting and storage, new plumbing fixtures and modern ventilation. Before any of it, we look at where the plumbing runs, what the structure allows, the light, your storage needs and how you use the room each day, so the layout improves along with the finishes.
For a 4-piece master bathroom of 60 to 100 sq ft, our estimates start from $17,500 at a standard finish, run $21,000 to $27,000 at a premium finish and start from $27,000 at a luxury finish. Layout changes, moving plumbing and the condition of what is behind the old finishes all move the final price.
We favour finishes that handle moisture and daily use and still look right together: large-format porcelain, handcrafted wall tile, quartz and Taj Mahal style quartz surfaces, brass fixtures, Shaker-style cabinetry and warm wood accents. We choose them for a calm room that lasts rather than for a short-term trend.
Typically 7 to 8 weeks from the first visit to handover. Measuring, design and the quote take about the first 3 weeks, and construction 3 to 5 more. In an older home, correcting a floor or plumbing before the tile goes in can add time.
At a standard finish, a 3-piece bathroom with a tub starts from $11,900, a 3-piece with a walk-in shower from $13,500, and a 4-piece master bathroom of 60 to 100 sq ft from $17,500. Bathrooms over 100 sq ft start from $20,000. Premium and luxury finishes raise each figure. Beyond size, the price follows layout changes, plumbing relocation, tile size and material, vanity customization, waterproofing and fixture quality. In older homes, problems hidden behind the existing finishes may need fixing first.
Yes. Nuance Design Build is fully licensed and insured. We carry WSIB coverage and $5 million in commercial liability insurance, which protects your home and investment for the whole renovation. Every project is professionally managed, with clear scheduling, daily coordination and supervision from demolition to final detailing, so workmanship, safety and cleanliness stay consistent at every stage.
Warranty terms are written into your contract. They keep our workmanship warranty, which covers how the work was built, separate from the manufacturers’ own warranties on products, fixtures and appliances. Every renovation finishes with detailing, a post-construction quality inspection and a final walkthrough before handover. Legal basement conversions also come with clear documentation of the approved work and ongoing support once the unit is complete.
A straightforward kitchen update with Nuance Design Build starts around $35,000. A fully customized kitchen, with premium cabinetry, quartz, quartzite or marble counters, upgraded lighting and a new layout, often runs $45,000 to $60,000 or more. Where yours lands depends on the cabinet material (Thermofoil, painted MDF, Egger or hardwood), the countertop, any plumbing changes, flooring that runs into the next rooms, built-in appliances and the lighting design. Settling the design early keeps the budget and the build in line, so the cost stays predictable.
In Toronto, a one-storey addition can start at about $300,000. Costs average around $200 per square foot and can pass $350 per square foot for more involved work. Labour, quality materials and professional design fees are the largest costs, and the addition’s size and complexity decide where it lands in that range. Nuance Design Build offers a free consultation and cost estimate, and builds the addition on a single contract, from the first idea to the occupancy permit.
Design comes first. Nuance Design Build settles the design before construction starts and keeps design, budgeting and construction with one team, so the project can be priced accurately early on. We show you which elements add the most value (cabinetry, countertops, lighting, flooring transitions) and where extra spending won’t show. After the first consultation you get a detailed, transparent quote built around your priorities, with no hidden costs, and your project manager tracks the budget through construction.
Construction on a basement renovation in Richmond Hill, Markham, Vaughan or Toronto typically takes 6 to 10 weeks. The whole process, design and permits included, usually runs 2 to 4 months. Small cosmetic updates can finish sooner. Legal basements, secondary suites and jobs with plumbing or structural work can push construction closer to 10 to 12 weeks. Careful planning and a properly prepared permit application are what keep the schedule predictable once work begins.
Nuance Design Build visits your home. We talk about how you use the space today and what needs to change, and take the measurements needed to start the design accurately. We also look at layout options, structural limits and where the utilities run, so the project starts from a realistic direction rather than a wish list. From there we prepare a detailed, transparent quote for the full scope, worked out around your budget and priorities.
Every Nuance Design Build project has a dedicated project manager who is your single point of contact. They coordinate the trades, run the schedule, oversee quality and keep you informed through demolition, rough-in, installation, finishing and the final walkthrough. You get a detailed construction schedule, updates before you have to ask, budget tracking and quality-control inspections, so you never have to chase different people for answers.
It depends on the scope and the municipality. Structural changes, additions and legal basement suites need a building permit, and the application itself can depend on where the home is. Nuance Design Build prepares the drawings and paperwork, works through the by-laws and zoning rules with the city and stays on it until the permit is approved. During construction we schedule and manage every required inspection.
A basement suite is legal in Ontario if it is a self-contained unit (a secondary dwelling unit) that meets the Ontario Building Code and local zoning by-laws and has passed municipal permit inspections. It usually needs a separate entrance, a full kitchen with proper ventilation, a 3- or 4-piece bathroom, bedrooms with egress windows, fire-rated separation between units, an independent or properly balanced HVAC system, soundproofing, ESA-certified electrical, and interconnected smoke and CO alarms. Without permits, it cannot legally be rented.
Not every basement qualifies as it stands. Before anything is designed, Nuance Design Build runs a feasibility assessment of the ceiling height, the foundation and structure, existing plumbing and electrical capacity, the HVAC system, zoning eligibility and where a separate entrance could go. Some basements need larger windows or mechanical upgrades to comply. You get an honest answer at this stage, before you commit to design or permit drawings.
Nuance Design Build works in 20 cities across the GTA: Richmond Hill, where we are based, plus Vaughan, Markham, Thornhill, King City, Downtown Toronto, North York, Scarborough, Etobicoke, Mississauga, Oakville, Burlington, Brampton, Pickering, Ajax, Whitby, Uxbridge, Aurora, Newmarket and Stouffville. We take on kitchens, bathrooms, basements (legal basement conversions included), home additions and full home renovations, as well as condo renovations and commercial fit-outs.
Still have a question?
Ask us directlyPeople also ask
Questions people across the GTA type into a search bar before they renovate, with short answers. Search them, or open one and follow where it leads.
23questions
Frameless glass, recessed niches, full-height tile walls, linear drains and bench seating are the upgrades homeowners ask for most. Together they make a walk-in shower feel open and easy to keep clean, and a curbless entry, with the floor sloped to the drain, removes the step altogether. In many Toronto homes, replacing an old tub this way changes how the bathroom works and how it looks.
People also ask
Keep the layout and plumbing where they are, and choose a standard finish. At Nuance Design Build, a 3-piece bathroom of 36 to 45 sq ft in Toronto then starts from $11,900 with a tub or $13,500 with a shower. Premium finishes run $14,000 to $22,000.
People also ask
Start with the layout rather than the tile. Looking at the plumbing, structure, lighting and storage together often turns up changes that make a small bathroom look bigger and cleaner, and a walk-in shower in place of a built-in tub opens it up further.
People also ask
For most GTA homes, yes. Finishing the basement is the most cost-effective way to add usable square footage without making the house any bigger. A legal secondary suite can also bring in monthly rent that goes toward the mortgage, and a permitted unit appeals at resale to investors, multi-generational families and buyers looking to offset carrying costs.
People also ask
Size sets the starting price. After that, the cost depends on layout changes, plumbing relocation, tile size and material, vanity customization, waterproofing requirements and fixture quality. In older Toronto homes, problems behind the existing finishes often have to be corrected first (a floor levelled, plumbing adjusted), and that adds preparation time and cost.
People also ask
Home additions in Toronto average about $200 per square foot, and more involved work can go past $350 per square foot. A one-storey addition can start at around $300,000. Most of the money goes to labour, quality materials and professional design fees, and the size and complexity of the addition decide where it falls in that range.
People also ask
Good to know
What is different about bathrooms in Burlington: who reviews the work, which rules apply and the houses we tend to find. Every by-law links its source.
When a Burlington bathroom does need a building permit, the drawings carry it: the plumbing layout, any change to the framing and the fixture positions agreed in design. We submit them once the layout is final, during permit coordination, and the crew begins after approval. Inspections are booked so each happens before the stage it covers is closed in, and your project manager tracks them alongside the trade schedule.
The first visit is for measuring and looking at the plumbing, the floor and the light. Design follows: the layout, vanity, shower or tub, tile and lighting are chosen together, then priced in a detailed quote. If the plan needs a permit, we file it next. Construction runs from demolition through rough-in, waterproofing, tile and fixtures, and the job ends with silicone, touch-ups and a full clean before we walk through the finished room with you.
Book a consultation
We visit, take the measurements and talk through what you have in mind.
Get A Free Estimate
Track record
While we build
Where we build