
An integrated design-build model
The people who design the house also price and build it, so the budget is accurate early and nothing is lost between separate firms.
Full home renovation · Whitby, Durham Region
Whole-house renovation in Whitby down to the structure on every floor, or a reworked main floor with the finishes renewed throughout. You get permit-ready drawings and a detailed quote set against your budget before work starts, then one team builds it.


RoomCentury home, Downtown Toronto
DetailBrushed gold at the window
What’s included
In Whitby a whole-house job covers every floor. Walls can move or come out with a beam in their place, plumbing, drains and heating are rerouted where the new plan needs them, and the finishes carry through every room.

Investment value, looks and function all count. Plans are practical, buildable and based on how you live at home.

Older houses reshaped safely, with qualified engineers and to Ontario Building Code requirements.

We make sure every material is sourced, ordered and delivered on time, through trusted local suppliers.

We build to the approved drawings, and a dedicated project manager coordinates every trade.
How it runs
Expect honest quotes. Communication stays clear, first meeting until final walkthrough.
We go through your needs and design ideas and measure the house. 1 wk, from week 0.
Up front, each cost is set to your priorities and budget. 2 to 3 wks, from week 1.
With the city, we go through applications, zoning and by-laws. 6 to 10 wks, from week 3.
Materials ordered through our suppliers and delivered on time. 4 to 6 wks, from week 5.
Checks on quality, a tidy site and work to approved drawings. 12 to 20 wks, from week 9.
Dedicated project manager, start to finish
Steps can run into the hatching. The times shown are typical, and no two jobs share a schedule.
Why Nuance
Nuance puts one team on your house, a team that handles every detail with nuance.

The people who design the house also price and build it, so the budget is accurate early and nothing is lost between separate firms.

Your single point of contact, who coordinates the trades, runs the schedule, checks quality and keeps you informed.

Walls out, steel beams in and basements underpinned, with qualified engineers under the Ontario Building Code.

Over 200 projects finished so far, every one led by a dedicated project manager throughout.
Client reviews
Google reviews from the homeowners and business owners we have built for.
Google reviewsJust wrapped up our full home renovation with Kevin's team, what an amazing experience! Kevin and his crew made everything so easy from design to finish. The quality and craftsmanship completely exceeded our expectations. Couldn’t be happier with how our home turned out!
We just finished a full home renovation with Nuance! Kevin and his team made the whole process smooth—from design ideas to picking materials. The craftsmanship and quality blew us away. My wife and I couldn’t be happier with the results!
Kevin and his team helped me renovate my new home, which was done incredibly well. They're nice and easy to work with, and offered many suggestions to how my home could look like when I lack ideas. They pay good attention to details to …
Kevin and his team are true professionals. We had a wonderful experience working with them on our home renovation. highly recommend Kevin and his team !
They did a great job renovating my bathroom and creating one in my basement. Kevin was very easy to work with and was able to accommodate all our requests. Everything looks really good!
Nuance Construction did an amazing job on our custom bathroom addition on the 1st floor. The team was professional, punctual, and kept everything clean throughout the project. … They completed the work on time and within budget, which was a pleasant surprise. … The final result exceeded our expectations.
I recently had the pleasure of working with Nuance Design Build for our new office renovation project, and I must say that my experience with them was nothing short of outstanding. From the initial consultation to the final walk-through, their professionalism, craftsmanship, and attention to detail were truly impressive.
Kevin and his team were instrumental to bringing my condo redesign vision to life! They were professional, knowledgeable in their trades and maintained great communication. They were a pleasure to work with and I would work with them again!
Kevin and his team completed a full renovation of our ensuite bathroom, shared bathroom, and laundry room and the results are amazing! Their craftsmanship and attention to detail really show in every part of the project. …
Thank you for turning my bathroom into one of those magazine bathrooms. Also excellent work on remove popcorn ceiling and adding pot lights.
I had an exceptional experience with the Nuance team. They were professional, transparent, and incredibly detail-oriented throughout the entire project. The workmanship was of the highest quality, communication was clear and consistent, and everything was completed on time as promised. I highly recommend Nuance Design Build for anyone looking for a reliable and trustworthy partner to bring their vision to reality.
Highly recommend Kevin and his team! They recently helped us finish our sunroom, and the whole process was smooth from start to finish. He’s very knowledgeable, easy to communicate with, and has a great attitude. We’re really happy with the result.
Kevin and his team are very professional, dedicated and easy to approach to. They can always provide the best advice based on my needs. I would definitely recommend them to my friends.
Kevin and team brought our visions to life. He understands our requests and relay the message to the team efficiently. Always ready to answer our questions/ concerns :)
I am really so much happy for the work you and your team has done there is no complaints you have great friendly people to work with keep up and wish you great success in your future Thanks 🙏
Reasonable price. All work finished on time. Efficient workers. Delivered what we expected.
01
Selected projects
Seven recent renovations across the GTA. Each one is paired with a photo from the job, taken before or during the work.


Downtown TorontoSpring 2024
The first floor is home to the client’s parents, so the two floors above it were rebuilt. Altering load-bearing structure opened the plan, the third-floor terrace grew to hold a new bathroom, and the laundry came out of the kitchen.



Richmond Hill
Full-height charcoal cabinets surround the island and matching backsplash, both in black marble whose white-and-gold veins wrap every face. The room is dark, but cream stools and the open shelves stop it feeling heavy.



North York2026
Walnut tones and warm white cabinets work with the dark floors that stayed. Both ends of the island finish in waterfall edges. Behind a big pocket door, custom pantry cabinetry extends into the living area, centred on open display shelves and a robot-vacuum bay.



Brampton2025
The owners gave the design free rein. Their basement became a lounge with a custom wet bar and a powder room, plus a nook built into the wall for the household’s cat.



UnionvilleSpring 2026
Frameless glass fronts a walk-in shower where the tub was; the water-closet partition is gone. Egger shaker panels, capped by Taj Mahal-style quartz, form the full-height storage, double vanity and makeup desk.



UxbridgeWinter 2024
The old garage came down, a new basement was excavated beneath it and two levels went up on top: a full three-storey addition, with the garage moved to the front of the lot.



Thornhill2026
The tub came out, and the bedroom entrance moved to the exterior wall behind a pocket door. A walnut slim-shaker vanity pairs one sink with a makeup area; the shower sets a marble floor against antique-brass fixtures.

Gallery
Kitchens, ensuites, basements and additions, with the framing and steel that come before the finishes.
Tap any photo to see it full size.Drag a row to scrub through it, or open any photo full size.
29photosKitchens, baths, basements & additions
Where we work
Kitchens, bathrooms, basements, additions and whole-home renovations in York Region, Toronto, Peel, Halton and Durham. The rings show roughly how long the drive is from our office, outside rush hour.
4 regions
York Region
Toronto
Peel & Halton
Durham
Not on the list?
The Greater Toronto Area is where we take on projects. If you send the house’s location, we’ll answer.
Get A Free EstimateQuestions & answers
Short answers on full home renovation in Whitby. The Whitby tab covers permits, local rules and the houses themselves, and the other tabs cover cost, timing and insurance.
A whole-house plan in Whitby can take in the basement as well as the floors above it, and finishing a basement is building permit work here, so including it adds drawings and inspections along with the construction. On the main floors, the cost follows how much structure moves, such as a bearing wall replaced by a beam or a relocated stair, and how far new plumbing and ductwork have to run. The finish level sets the rest, and the detailed quote, prepared after the consultation and measurements, is worked to your budget and priorities.
A Whitby whole-house job runs 21 to 29 weeks on our usual timings, about 12 to 20 of them in construction. The weeks before the build cover the consultation, the detailed quote and the permit, and once work starts your project manager requests each of the Town's inspections as the work reaches it.
Yes. Almost every whole-house plan includes work Whitby issues building permits for, from moved walls to new services, so we draw the whole house and file one application with the Building Services Division. A house in Werden's Plan or Brooklin, Whitby's two heritage conservation districts, also needs a heritage permit for the changes to its exterior.
Through the district plan and a heritage permit. In Werden's Plan and Brooklin, exterior changes follow the district's guidelines, and Whitby's heritage permit application can include photographs of the house, site plans, drawings and samples of the materials you propose, physical or visual. So on a whole-house job in either district, the windows, doors and cladding are chosen early and assembled with the drawings into one package for the Town.
Yes. Whitby treats adding a window or a door as a structural alteration that needs a building permit, so each new opening is drawn with the framing around it and filed with the other changes to the house. Where the openings go is settled with the floor plan: a window where the opened main floor needs daylight is sized and placed in the same drawings as the rooms it lights.
It can include complete gutting, demolition and remodelling. We produce the design and permit-ready drawings, make the structural changes, handle product selection, and build through flooring, tiling, painting and finishing carpentry. A dedicated project manager runs it all, through to a thorough final walkthrough.
Yes. Open-concept main floor conversions are among the most common structural jobs we do. We remove load-bearing walls, install steel beams and reinforce the framing with qualified engineers, to Ontario Building Code requirements.
Sometimes. In spring 2024 we rebuilt the top two floors of a Downtown Toronto century home while the owners’ parents lived on the first. It depends on the scope, so raise it at the first consultation. Either way, the site stays clean and safe.
Yes. Our designers turn your ideas into practical, buildable plans, including permit-ready drawings, and the construction team builds exactly to the approved set, so the design you sign off is the house you get.
Design comes first. Nuance Design Build settles the design before construction starts and keeps design, budgeting and construction with one team, so the project can be priced accurately early on. We show you which elements add the most value (cabinetry, countertops, lighting, flooring transitions) and where extra spending won’t show. After the first consultation you get a detailed, transparent quote built around your priorities, with no hidden costs, and your project manager tracks the budget through construction.
Every Nuance Design Build project has a dedicated project manager who is your single point of contact. They coordinate the trades, run the schedule, oversee quality and keep you informed through demolition, rough-in, installation, finishing and the final walkthrough. You get a detailed construction schedule, updates before you have to ask, budget tracking and quality-control inspections, so you never have to chase different people for answers.
It depends on the scope and the municipality. Structural changes, additions and legal basement suites need a building permit, and the application itself can depend on where the home is. Nuance Design Build prepares the drawings and paperwork, works through the by-laws and zoning rules with the city and stays on it until the permit is approved. During construction we schedule and manage every required inspection.
Warranty terms are written into your contract. They keep our workmanship warranty, which covers how the work was built, separate from the manufacturers’ own warranties on products, fixtures and appliances. Every renovation finishes with detailing, a post-construction quality inspection and a final walkthrough before handover. Legal basement conversions also come with clear documentation of the approved work and ongoing support once the unit is complete.
A straightforward kitchen update with Nuance Design Build starts around $35,000. A fully customized kitchen, with premium cabinetry, quartz, quartzite or marble counters, upgraded lighting and a new layout, often runs $45,000 to $60,000 or more. Where yours lands depends on the cabinet material (Thermofoil, painted MDF, Egger or hardwood), the countertop, any plumbing changes, flooring that runs into the next rooms, built-in appliances and the lighting design. Settling the design early keeps the budget and the build in line, so the cost stays predictable.
At a standard finish, a 3-piece bathroom with a tub starts from $11,900, a 3-piece with a walk-in shower from $13,500, and a 4-piece master bathroom of 60 to 100 sq ft from $17,500. Bathrooms over 100 sq ft start from $20,000. Premium and luxury finishes raise each figure. Beyond size, the price follows layout changes, plumbing relocation, tile size and material, vanity customization, waterproofing and fixture quality. In older homes, problems hidden behind the existing finishes may need fixing first.
In Toronto, a one-storey addition can start at about $300,000. Costs average around $200 per square foot and can pass $350 per square foot for more involved work. Labour, quality materials and professional design fees are the largest costs, and the addition’s size and complexity decide where it lands in that range. Nuance Design Build offers a free consultation and cost estimate, and builds the addition on a single contract, from the first idea to the occupancy permit.
Construction on a basement renovation in Richmond Hill, Markham, Vaughan or Toronto typically takes 6 to 10 weeks. The whole process, design and permits included, usually runs 2 to 4 months. Small cosmetic updates can finish sooner. Legal basements, secondary suites and jobs with plumbing or structural work can push construction closer to 10 to 12 weeks. Careful planning and a properly prepared permit application are what keep the schedule predictable once work begins.
Nuance Design Build visits your home. We talk about how you use the space today and what needs to change, and take the measurements needed to start the design accurately. We also look at layout options, structural limits and where the utilities run, so the project starts from a realistic direction rather than a wish list. From there we prepare a detailed, transparent quote for the full scope, worked out around your budget and priorities.
A basement suite is legal in Ontario if it is a self-contained unit (a secondary dwelling unit) that meets the Ontario Building Code and local zoning by-laws and has passed municipal permit inspections. It usually needs a separate entrance, a full kitchen with proper ventilation, a 3- or 4-piece bathroom, bedrooms with egress windows, fire-rated separation between units, an independent or properly balanced HVAC system, soundproofing, ESA-certified electrical, and interconnected smoke and CO alarms. Without permits, it cannot legally be rented.
Not every basement qualifies as it stands. Before anything is designed, Nuance Design Build runs a feasibility assessment of the ceiling height, the foundation and structure, existing plumbing and electrical capacity, the HVAC system, zoning eligibility and where a separate entrance could go. Some basements need larger windows or mechanical upgrades to comply. You get an honest answer at this stage, before you commit to design or permit drawings.
Yes. Nuance Design Build is fully licensed and insured. We carry WSIB coverage and $5 million in commercial liability insurance, which protects your home and investment for the whole renovation. Every project is professionally managed, with clear scheduling, daily coordination and supervision from demolition to final detailing, so workmanship, safety and cleanliness stay consistent at every stage.
Nuance Design Build works in 20 cities across the GTA: Richmond Hill, where we are based, plus Vaughan, Markham, Thornhill, King City, Downtown Toronto, North York, Scarborough, Etobicoke, Mississauga, Oakville, Burlington, Brampton, Pickering, Ajax, Whitby, Uxbridge, Aurora, Newmarket and Stouffville. We take on kitchens, bathrooms, basements (legal basement conversions included), home additions and full home renovations, as well as condo renovations and commercial fit-outs.
Still have a question?
Ask us directlyPeople also ask
Questions people across the GTA type into a search bar before they renovate, with short answers. Search them, or open one and follow where it leads.
23questions
For many Toronto homeowners, yes: they renovate rather than move, and turn a fixer-upper or an older home into a personalized, high-functioning one. Done professionally, a full renovation can improve comfort, efficiency and property value without leaving the neighbourhood.
People also ask
Put the steps in order and give each a typical length. At Nuance Design Build a full renovation typically runs 21 to 29 weeks: about a week for the consultation, 2 to 3 for the quote, 6 to 10 for the permit with products chosen alongside, and 12 to 20 weeks of construction from week 9.
People also ask
A renovation project manager is your single point of contact: they coordinate the trades, run the schedule, oversee quality and keep you informed. At Nuance Design Build that covers detailed construction schedules, budget tracking, quality control inspections, a clean and safe job site and a thorough final walkthrough.
People also ask
For most GTA homes, yes. Finishing the basement is the most cost-effective way to add usable square footage without making the house any bigger. A legal secondary suite can also bring in monthly rent that goes toward the mortgage, and a permitted unit appeals at resale to investors, multi-generational families and buyers looking to offset carrying costs.
People also ask
Size sets the starting price. After that, the cost depends on layout changes, plumbing relocation, tile size and material, vanity customization, waterproofing requirements and fixture quality. In older Toronto homes, problems behind the existing finishes often have to be corrected first (a floor levelled, plumbing adjusted), and that adds preparation time and cost.
People also ask
Home additions in Toronto average about $200 per square foot, and more involved work can go past $350 per square foot. A one-storey addition can start at around $300,000. Most of the money goes to labour, quality materials and professional design fees, and the size and complexity of the addition decide where it falls in that range.
People also ask
Good to know
What is different about full renovations in Whitby: who reviews the work, which rules apply and the houses we tend to find. Every by-law links its source.
If your house is in Werden's Plan, the downtown district of 250 properties, or in Brooklin's district of 169, the order of approvals matters for a whole-house job. The heritage permit comes first, with the exterior already designed to the district's guidelines, and the building permit follows with drawings that match what heritage review accepted. Elsewhere in town, the building permit is the main approval. In both cases we prepare and submit every drawing the Town asks for.
Source: Town of Whitby (opens in a new tab)Opening the main floor can mean joining the kitchen to the living and dining space and carrying it through to the back of the house. A main-floor walkout from the new kitchen to the yard is one of the changes Whitby names as needing a building permit, so it is drawn with the rest of the floor plan rather than added later. Inside, a wall that carries the floor above gives way to a beam designed by an engineer, and with that wall gone, the island, sink and range can be placed for the new room instead of the old one.
Book a consultation
We visit, take the measurements and talk through what you have in mind.
Get A Free Estimate
Track record
While we build
Where we build