
Earn rental income
Designed well, a legal apartment can earn monthly rent in the GTA’s rental market and help offset rising property costs and the mortgage.
Basement renovation · Whitby, Durham Region
Basement renovations in Whitby: family rooms with a bathroom, a walkout to the yard, or a separate apartment with its own door. We design the level, take it through the Town's permits and build it, under a dedicated project manager.


RoomLower-level wet bar, Brampton
DetailOpen shelf over navy shaker
What’s included
A Whitby basement can become rec rooms, an office, bedrooms and a bathroom, a walkout, or an additional dwelling unit with its own entrance. Each room is drawn before framing, with the laundry and mechanical room kept easy to reach.

A unit of its own, built to the province’s and municipality’s building rules so it’s legal to rent.

Planned to feel open and bright, they’re finished to match the style one floor up.

These decide whether a basement is comfortable to live in, so we plan them in from the first drawing.

We deal with the municipality until the permit package we prepare and file is approved, then book each inspection.
How it runs
Your conversion runs in five stages, and no two overlap.
We check ceiling height, structure, services and zoning before promising anything. 1 wk, from week 0.
Up to code, the layout balances comfort with what renters want. 2 wks, from week 1.
Until approval, we work with the city on drawings we draft and file. 3 to 5 wks, from week 3.
Inspections are ours to book. Each stage clears before the next. 10 to 12 wks, from week 6.
Officially signed off, clearly documented, warranty terms in writing. 1 wk, from week 16.
Dedicated project manager, start to finish
The bars show typical timings, hatched where steps may run long. Schedules are set job by job.
Why build it legally
Among the soundest investments open to a GTA homeowner is a basement suite, built right and with permits.

Designed well, a legal apartment can earn monthly rent in the GTA’s rental market and help offset rising property costs and the mortgage.

Multi-generational families want a permitted secondary unit. So do investors and buyers who’d like help with carrying costs.

Ventilation, fire separation, structural compliance and proper egress keep tenants, the family and the house safe.

Without permits you risk municipal fines, closure orders, your insurer denying a claim and problems when you sell.
Client reviews
Google reviews from the homeowners and business owners we have built for.
Google reviewsThey did a great job renovating my bathroom and creating one in my basement. Kevin was very easy to work with and was able to accommodate all our requests. Everything looks really good!
Nuance Construction did an amazing job on our custom bathroom addition on the 1st floor. The team was professional, punctual, and kept everything clean throughout the project. … They completed the work on time and within budget, which was a pleasant surprise. … The final result exceeded our expectations.
Kevin and his team helped me renovate my new home, which was done incredibly well. They're nice and easy to work with, and offered many suggestions to how my home could look like when I lack ideas. They pay good attention to details to …
I recently had the pleasure of working with Nuance Design Build for our new office renovation project, and I must say that my experience with them was nothing short of outstanding. From the initial consultation to the final walk-through, their professionalism, craftsmanship, and attention to detail were truly impressive.
Kevin and his team were instrumental to bringing my condo redesign vision to life! They were professional, knowledgeable in their trades and maintained great communication. They were a pleasure to work with and I would work with them again!
Kevin and his team completed a full renovation of our ensuite bathroom, shared bathroom, and laundry room and the results are amazing! Their craftsmanship and attention to detail really show in every part of the project. …
Just wrapped up our full home renovation with Kevin's team, what an amazing experience! Kevin and his crew made everything so easy from design to finish. The quality and craftsmanship completely exceeded our expectations. Couldn’t be happier with how our home turned out!
Thank you for turning my bathroom into one of those magazine bathrooms. Also excellent work on remove popcorn ceiling and adding pot lights.
I had an exceptional experience with the Nuance team. They were professional, transparent, and incredibly detail-oriented throughout the entire project. The workmanship was of the highest quality, communication was clear and consistent, and everything was completed on time as promised. I highly recommend Nuance Design Build for anyone looking for a reliable and trustworthy partner to bring their vision to reality.
Highly recommend Kevin and his team! They recently helped us finish our sunroom, and the whole process was smooth from start to finish. He’s very knowledgeable, easy to communicate with, and has a great attitude. We’re really happy with the result.
We just finished a full home renovation with Nuance! Kevin and his team made the whole process smooth—from design ideas to picking materials. The craftsmanship and quality blew us away. My wife and I couldn’t be happier with the results!
Kevin and his team are true professionals. We had a wonderful experience working with them on our home renovation. highly recommend Kevin and his team !
Kevin and his team are very professional, dedicated and easy to approach to. They can always provide the best advice based on my needs. I would definitely recommend them to my friends.
Kevin and team brought our visions to life. He understands our requests and relay the message to the team efficiently. Always ready to answer our questions/ concerns :)
I am really so much happy for the work you and your team has done there is no complaints you have great friendly people to work with keep up and wish you great success in your future Thanks 🙏
Reasonable price. All work finished on time. Efficient workers. Delivered what we expected.
01
Selected projects
These are seven recent renovations in the GTA. Each one has an on-site photo from before work started or mid-job.


Brampton2025
A lounge took over the basement. The household’s cat has a nook set into a wall, and there’s a custom wet bar plus a powder room. The owners let us design it our way.



Richmond Hill
Full-height charcoal cabinets surround the island and matching backsplash, both in black marble whose white-and-gold veins wrap every face. The room is dark, but cream stools and the open shelves stop it feeling heavy.



North York2026
Custom pantry cabinetry, built around a robot-vacuum bay plus open display shelves, reaches the living area with a large pocket door in front. The island has a waterfall edge at each end. Warm white cabinets alongside walnut tones suit the existing dark floors.



Downtown TorontoSpring 2024
The first floor is home to the client’s parents, so the two floors above it were rebuilt. Altering load-bearing structure opened the plan, the third-floor terrace grew to hold a new bathroom, and the laundry came out of the kitchen.



UnionvilleSpring 2026
Frameless glass fronts a walk-in shower where the tub was; the water-closet partition is gone. Egger shaker panels, capped by Taj Mahal-style quartz, form the full-height storage, double vanity and makeup desk.



UxbridgeWinter 2024
Three full storeys now stand where the old garage was. It was demolished, a new basement dug underneath and two levels built above. The garage was relocated to the front.



Thornhill2026
The tub came out, and the bedroom entrance moved to the exterior wall behind a pocket door. A walnut slim-shaker vanity pairs one sink with a makeup area; the shower sets a marble floor against antique-brass fixtures.

Gallery
Finished additions, basements, ensuites and kitchens, and the steel and framing that came first.
Tap any photo to see it full size.Drag a row to scrub through it, or open any photo full size.
29photosKitchens, baths, basements & additions
Where we work
Kitchens, bathrooms, basements, additions and whole-home renovations in York Region, Toronto, Peel, Halton and Durham. The rings show roughly how long the drive is from our office, outside rush hour.
4 regions
York Region
Toronto
Peel & Halton
Durham
Not on the list?
Give us the location of the house and you’ll hear back. We build all over the Greater Toronto Area.
Get A Free EstimateQuestions & answers
Short answers on basement renovation in Whitby. The Whitby tab covers permits, local rules and the houses themselves, and the other tabs cover cost, timing and insurance.
Many Whitby basements are being finished for the first time, especially under the subdivisions built since the mid-1990s in north Whitby and Brooklin. With no old finish to strip out, the price follows what goes in: the rooms and how they are divided, a bathroom and the drains it needs, and the finishes you choose. A walkout adds a structural opening in the foundation. An additional dwelling unit adds a fire separation from your floors, egress from each bedroom and its own kitchen and bathroom. We price it from the measured design.
In Whitby a basement unit has one more step after construction: under By-law 8156-25, every additional dwelling unit has to be registered with the Town, so a unit's job ends at registration rather than at the final inspection. The build itself runs 6 to 10 weeks for a family finish and nearer 10 to 12 for a unit, and the whole project 2 to 4 months including design and the permit.
Yes, even when the basement stays one open room for the family: in Whitby, finishing a basement is building permit work in its own right. We prepare the drawings for everything the plan includes and file them with the Town's Building Services Division before framing starts.
Certain single detached and semi-detached homes: those are the houses where Whitby allows additional dwelling units. Whether yours is one depends on its type and its zoning, so we check both against the Town's rules at the first visit, before any money goes into design. If it qualifies, the measuring visit turns to the basement itself: its ceiling height, the foundation, and where a separate entrance and egress windows for the bedrooms can go.
Yes. A walkout cuts an opening through the foundation, which is structural work, so it is designed and put on the permit drawings with the rest of the basement before anything is cut. Where it goes depends on what the basement is for: off a family room in a finish you'll use yourselves, or as the unit's own entrance when the basement becomes an additional dwelling unit.
Legal secondary suites, rec rooms, home offices, fitness rooms, kids’ playrooms, in-law suites, home theatres and guest bedrooms, with full bathrooms and laundry where you need them. We lay out each one so it feels like part of the house above.
We plan for both at the design stage. Every Nuance Design Build basement gets moisture control and waterproofing, proper insulation and vapour barriers, and soundproofing between floors, worked out alongside the lighting layout and ceiling design.
We check feasibility, design the suite to the Code and prepare the permit drawings. During construction we book every required inspection and each stage passes before the next starts. After the last inspection the unit is approved, with clear documentation of the approved work.
For a legal suite or structural work, yes: you need a building permit. Other jobs depend on the scope and your municipality. We prepare the structural and engineering drawings for the application, plus design concepts, mood boards and material selection.
Construction on a basement renovation in Richmond Hill, Markham, Vaughan or Toronto typically takes 6 to 10 weeks. The whole process, design and permits included, usually runs 2 to 4 months. Small cosmetic updates can finish sooner. Legal basements, secondary suites and jobs with plumbing or structural work can push construction closer to 10 to 12 weeks. Careful planning and a properly prepared permit application are what keep the schedule predictable once work begins.
It depends on the scope and the municipality. Structural changes, additions and legal basement suites need a building permit, and the application itself can depend on where the home is. Nuance Design Build prepares the drawings and paperwork, works through the by-laws and zoning rules with the city and stays on it until the permit is approved. During construction we schedule and manage every required inspection.
A basement suite is legal in Ontario if it is a self-contained unit (a secondary dwelling unit) that meets the Ontario Building Code and local zoning by-laws and has passed municipal permit inspections. It usually needs a separate entrance, a full kitchen with proper ventilation, a 3- or 4-piece bathroom, bedrooms with egress windows, fire-rated separation between units, an independent or properly balanced HVAC system, soundproofing, ESA-certified electrical, and interconnected smoke and CO alarms. Without permits, it cannot legally be rented.
Not every basement qualifies as it stands. Before anything is designed, Nuance Design Build runs a feasibility assessment of the ceiling height, the foundation and structure, existing plumbing and electrical capacity, the HVAC system, zoning eligibility and where a separate entrance could go. Some basements need larger windows or mechanical upgrades to comply. You get an honest answer at this stage, before you commit to design or permit drawings.
A straightforward kitchen update with Nuance Design Build starts around $35,000. A fully customized kitchen, with premium cabinetry, quartz, quartzite or marble counters, upgraded lighting and a new layout, often runs $45,000 to $60,000 or more. Where yours lands depends on the cabinet material (Thermofoil, painted MDF, Egger or hardwood), the countertop, any plumbing changes, flooring that runs into the next rooms, built-in appliances and the lighting design. Settling the design early keeps the budget and the build in line, so the cost stays predictable.
At a standard finish, a 3-piece bathroom with a tub starts from $11,900, a 3-piece with a walk-in shower from $13,500, and a 4-piece master bathroom of 60 to 100 sq ft from $17,500. Bathrooms over 100 sq ft start from $20,000. Premium and luxury finishes raise each figure. Beyond size, the price follows layout changes, plumbing relocation, tile size and material, vanity customization, waterproofing and fixture quality. In older homes, problems hidden behind the existing finishes may need fixing first.
In Toronto, a one-storey addition can start at about $300,000. Costs average around $200 per square foot and can pass $350 per square foot for more involved work. Labour, quality materials and professional design fees are the largest costs, and the addition’s size and complexity decide where it lands in that range. Nuance Design Build offers a free consultation and cost estimate, and builds the addition on a single contract, from the first idea to the occupancy permit.
Design comes first. Nuance Design Build settles the design before construction starts and keeps design, budgeting and construction with one team, so the project can be priced accurately early on. We show you which elements add the most value (cabinetry, countertops, lighting, flooring transitions) and where extra spending won’t show. After the first consultation you get a detailed, transparent quote built around your priorities, with no hidden costs, and your project manager tracks the budget through construction.
Nuance Design Build visits your home. We talk about how you use the space today and what needs to change, and take the measurements needed to start the design accurately. We also look at layout options, structural limits and where the utilities run, so the project starts from a realistic direction rather than a wish list. From there we prepare a detailed, transparent quote for the full scope, worked out around your budget and priorities.
Every Nuance Design Build project has a dedicated project manager who is your single point of contact. They coordinate the trades, run the schedule, oversee quality and keep you informed through demolition, rough-in, installation, finishing and the final walkthrough. You get a detailed construction schedule, updates before you have to ask, budget tracking and quality-control inspections, so you never have to chase different people for answers.
Yes. Nuance Design Build is fully licensed and insured. We carry WSIB coverage and $5 million in commercial liability insurance, which protects your home and investment for the whole renovation. Every project is professionally managed, with clear scheduling, daily coordination and supervision from demolition to final detailing, so workmanship, safety and cleanliness stay consistent at every stage.
Warranty terms are written into your contract. They keep our workmanship warranty, which covers how the work was built, separate from the manufacturers’ own warranties on products, fixtures and appliances. Every renovation finishes with detailing, a post-construction quality inspection and a final walkthrough before handover. Legal basement conversions also come with clear documentation of the approved work and ongoing support once the unit is complete.
Nuance Design Build works in 20 cities across the GTA: Richmond Hill, where we are based, plus Vaughan, Markham, Thornhill, King City, Downtown Toronto, North York, Scarborough, Etobicoke, Mississauga, Oakville, Burlington, Brampton, Pickering, Ajax, Whitby, Uxbridge, Aurora, Newmarket and Stouffville. We take on kitchens, bathrooms, basements (legal basement conversions included), home additions and full home renovations, as well as condo renovations and commercial fit-outs.
Still have a question?
Ask us directlyPeople also ask
Questions people across the GTA type into a search bar before they renovate, with short answers. Search them, or open one and follow where it leads.
23questions
A legal basement is a basement apartment, or secondary suite, built to the Ontario Building Code and the local zoning by-law, with every permit inspection passed. Without permits the unit cannot legally be rented, and it may create insurance, resale or liability risks.
People also ask
Yes. A legal basement suite needs soundproofing assemblies between the floors and fire-rated separation between the two units. Nuance Design Build plans the soundproofing with the layout, then installs soundproofing insulation and fire-rated drywall during construction.
People also ask
Not always. A legal suite needs its own HVAC system or a properly balanced shared one, plus proper ventilation, often an HRV. Nuance Design Build checks the existing system at the feasibility stage and includes HVAC layouts in the permit drawings.
People also ask
For most GTA homes, yes. Finishing the basement is the most cost-effective way to add usable square footage without making the house any bigger. A legal secondary suite can also bring in monthly rent that goes toward the mortgage, and a permitted unit appeals at resale to investors, multi-generational families and buyers looking to offset carrying costs.
People also ask
Size sets the starting price. After that, the cost depends on layout changes, plumbing relocation, tile size and material, vanity customization, waterproofing requirements and fixture quality. In older Toronto homes, problems behind the existing finishes often have to be corrected first (a floor levelled, plumbing adjusted), and that adds preparation time and cost.
People also ask
Home additions in Toronto average about $200 per square foot, and more involved work can go past $350 per square foot. A one-storey addition can start at around $300,000. Most of the money goes to labour, quality materials and professional design fees, and the size and complexity of the addition decide where it falls in that range.
People also ask
Good to know
What is different about basements in Whitby: who reviews the work, which rules apply and the houses we tend to find. Every by-law links its source.
A Whitby basement permit is drawn from the finished plan, so the choices you make in design are what the Town reviews: where a bathroom's drains run under the slab, which wall a walkout cuts through and how the opening is carried, and, for a unit, the fire separation between the floors and an egress window for each bedroom. We file it once you have approved the design and its estimate, and framing waits until it is issued. During the build, your project manager calls in each inspection as its stage is ready.
Source: Town of Whitby (opens in a new tab)Every additional dwelling unit in Whitby has to be registered with the Town, including one that has been there for years. Before the Town registers a unit, it wants proof the wiring is safe: a Certificate of Acceptance, which a Licensed Electrical Contractor can provide after checking the unit against the Ontario Electrical Safety Code. Our electrical work on a suite is done by such a contractor, so the certificate is issued as the build ends instead of being chased afterwards. Your registration then goes in with the certificate and the building permits the unit needed, and Enforcement Services comes out to inspect the exterior of the property.
Source: Town of Whitby (opens in a new tab)Whitby's radon mitigation requirements don't apply to existing dwellings or to retrofits that create a secondary unit, so finishing your basement, or building an apartment in it, carries no mandatory radon work. That leaves testing and mitigation to you, and the time to decide is before the basement is closed in: anything done under the slab or along the foundation walls has to go in before framing, insulation and flooring cover them. If you'd like a test first, tell us early in design, so the result is back before the schedule reaches that stage.
Source: Town of Whitby (opens in a new tab)Book a consultation
We visit, take the measurements and talk through what you have in mind.
Get A Free Estimate
Track record
While we build
Where we build